天津港有码头岸线1.7万m,其中95%以上是第一航务工程局建设完成的。在建设过程中发展和完善了多项施工技术,使之达到国际先进水平。如重力式结构在天津港的应用问题、软基加固问题、较大直径桩的打设问题等。为适应天津港进一步的开发与建设,除上述问题外,尚需对符的入土深度与承载力的问题、噪音小功率大的打桩设备、已建水工建筑物的维修技术、高强混凝土及高强粘合剂等做进一步研究。
Tianjin Port has a wharf coastline of 17,000 m, of which over 95% is the completion of the first air traffic engineering bureau. In the course of construction, we have developed and perfected a number of construction techniques to bring them to the advanced international level. Such as the application of gravitational structures in Tianjin Port, the reinforcement of soft ground, the laying of larger diameter piles, and so on. In order to meet the further development and construction of Tianjin Port, in addition to the above problems, the problems such as the penetration depth and bearing capacity of fenders, piling equipment with low noises, maintenance techniques of hydraulic structures already built, high-strength concrete and high- Adhesives, etc. for further study.