天津地铁既有线改造工程新旧结构差异沉降控制措施研究

来源 :隧道建设 | 被引量 : 0次 | 上传用户:ytcxw
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在天津市地铁一号线既有线改造工程中,必须解决将原有车站进行改造所面临的差异沉降控制问题。因车站地处交通要道下,附近交通拥挤,使得改造工作难度较大。从施工的环保和安全角度出发,对控制结构在开挖过程中、改造完成并回填土后的沉降以及减少新旧结构差异沉降方法进行了研究,给出了解决方案。 In the existing reconstruction project of Tianjin Metro Line 1, it is necessary to solve the problem of differential settlement control faced by the original station. Due to the station is located under the traffic arteries, traffic congestion in the vicinity, making reconstruction more difficult. From the perspective of environmental protection and safety of construction, the control structure during the excavation process, the completion of the transformation and the settlement after the backfill and the method of reducing the differential settlements of the old and the new structures were studied and the solutions were given.
其他文献
对山西天脊煤化工集团有限公司20800Nm^3/hO2空分装置主冷器出现问题后的现象进行分析、判断,介绍了主冷器的损坏和原因分析。
为了实现地面对盾构施工的实时监控,同时又能摆脱第三方组态软件的各种局限,尝试采用OPC技术规范来实现PLC与地面监控PC机的通信,设计开发一套基于OPC的盾构地面数据采集和监
以甲烷磺酸作催化剂合成邻苯二甲酸二辛酯。主要考察催化剂的性能,用正交设计的方法来确定较佳的实验条件,同时与硫酸催化剂进行了比较,从实验的结果已显示出甲烷磺酸的优越性。
时间性差异是因税法与会计制度确认收益、费用或损失的时间不同而产生的税前会计利润与应纳税所得额的差异。在坏账损失的确认方法上,税法与会计制度存在较大的差异,因而也需要
黔桂铁路扩能改造工程的那马隧道设计全长2788m,地质松散破碎,而且穿过多处断层。施工中发现出口部分段落处于山体滑坡层上,地质情况相对复杂。由于工期紧迫,施工方案选定中
红枣于700℃高温灰化溶解后,显色剂DAM与Fe^3+生成橙红色的配合物,用分光光度法测定其铁含量。
以TBM主机皮带机双向螺旋橡胶托辊为研究对象,分析其在运输物料的过程中弯矩、剪力和轴力的变化,详细阐述托辊支架的优点和具体的安装方式,说明这种托辊运输的优点。通过分析
论文对高等职业教育工程造价专业《建筑CAD》课程改革的必要性进行剖析,进而提出从教学方法,教学内容,考核方式等方面进行改革,采用项目化教学模式,依托实际工程项目施工图,重新整
2009年4月15日,全长85.32km的大伙房水库输水工程全线贯通。水利部副部长鄂竞平、辽宁省常务副省长许卫国及7个受水城市主管副市长、辽宁省相关厅局单位领导参加了贯通庆典。受
"辩论模式教学",是指教师根据德育课中的某一论题内容结合社会实际和学生实际,就某一方面拟定正反两个观点,引导学生进行讨论、展开辩论。"辩论模式教学"使传统的"灌输式"的