2016年度,101室开展了101堆运行维护,101堆退役项目申请,101堆、492堆“十二·五”乏燃料外运项目申请等工作。1运行维护2016年,101堆全年处于安全停闭状态,根据反应堆安全停闭期特点,结合各项目进展情况,执行《重水研究堆安全关闭期运行维护、监测规程》和其他相关规程,开展了相关系统、设备的维护和监测工作,包括:1)根据2016年检修计划,完成了101堆系统、设备的维护工作,保持了
In 2016, Room 101 carried out 101 pile operation and maintenance, 101 pile retired project application, 101 pile, 492 heap “12.5 ” spent fuel outbound project application. 1 Operation and Maintenance In 2016, the 101 pile was in a safe shutdown throughout the year. According to the characteristics of the reactor safety shutdown period and in accordance with the progress of each project, the “Operation, Maintenance and Monitoring Procedures of the Heavy Water Research Reactor during the Safety Shutdown Period” and other relevant regulations were carried out The related systems and equipment maintenance and monitoring work included: 1) According to the 2016 maintenance plan, the maintenance of the 101-pile system and equipment was completed and maintained