论文部分内容阅读
装配式混凝土结构的主要预制混凝土构件剪力墙,在预制工厂采用台模生产,由于构件有预留钢筋伸出侧模板,封缝堵洞的方法成为一项重要的工序。装配式混凝土结构预制墙侧向预留洞简易封堵法,是采用PVC管和泡沫棒相结合,封堵预留钢筋模板洞,其加工使用方法如下。
The prefabricated concrete member shear wall of the prefabricated factory is produced by the prefabricated concrete member of the prefabricated factory. Since the prefabricated member has the template of extending the protruding side of the prefabricated concrete, the method of sealing the plugging hole becomes an important process. Prefabricated prefabricated concrete wall prefabricated side of the building block simple plugging method is the use of PVC pipe and foam rods combined to block the template holes reserved for reinforcement, the use of its processing as follows.