装配式混凝土结构预制墙侧向预留简易封堵法

来源 :建筑工人 | 被引量 : 0次 | 上传用户:tronsung123
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
装配式混凝土结构的主要预制混凝土构件剪力墙,在预制工厂采用台模生产,由于构件有预留钢筋伸出侧模板,封缝堵洞的方法成为一项重要的工序。装配式混凝土结构预制墙侧向预留洞简易封堵法,是采用PVC管和泡沫棒相结合,封堵预留钢筋模板洞,其加工使用方法如下。 The prefabricated concrete member shear wall of the prefabricated factory is produced by the prefabricated concrete member of the prefabricated factory. Since the prefabricated member has the template of extending the protruding side of the prefabricated concrete, the method of sealing the plugging hole becomes an important process. Prefabricated prefabricated concrete wall prefabricated side of the building block simple plugging method is the use of PVC pipe and foam rods combined to block the template holes reserved for reinforcement, the use of its processing as follows.
其他文献
本文通过对荣华二采区10
期刊
目的 :探讨内镜黏膜下剥离术(endoscopic submucosal dissection,ESD)或经内镜黏膜下隧道肿瘤切除术(submucosal tunneling endoscopic resection,STER)在上消化道黏膜下肿瘤
目的 :研究个体化健康教育指导模式对康复期精神分裂患者的作用效果.方法:选择在我院住院治疗的康复期精神分裂患者82例,以随机数字法分为试验组与对照组各41例,对照组予常规
为客观评价感染性心内膜炎(IE)病人的严重程度,本文作者制定了一种评价方法,可较好地估计IE病人的死亡率。方法:1971~1986年收治的176例IE病人,男92例,女84例;年龄 12~70(29.8
2016年10月18~22日,上海新国际博览中心N1馆A141展位,第六届中国国际全印展“印刷梦工厂”小森公司所在地.在这里,两本“巨作大书”格外引人注目.来此参观的观众总会驻足观看,
期刊
今年1~9月,全国施工项目计划总投资974089亿元,同比增长9.1%,增速比1~8月提高0.3个百分点.施工项目638848个,比去年同期增加104930个,比上月末增加64804个.其中,东部地区施工
期刊
目的:探讨重度妊高症患者剖宫产麻醉临床效果.方法:选取我院2015年1月~2016年3月接收的重度妊高症剖宫产手术患者96例作为研究对象,随机均分为两组,各48例,对照组患者通过硬膜
目的 :在四肢骨折患者康复训练对患者肢体恢复情况的影响情况.方法 :选取本院2015年7月-2016年7月所收治四肢骨折患者70例,将这些患者分为观察组对照组,每组35例,对照组实施
目的:分析肝硬化患者非静脉曲张性上消化道出血的临床特点,以期对其有效治疗.方法:选取我院消化内科2017年1月至2017年10月收治的60例肝硬化并发上消化道出血的患者为研究对
本文通过对荣华二采区10