论文部分内容阅读
介绍了在武汉阳逻长江大桥南岸漫滩上施工钻孔灌注桩过程中 ,在特殊地质条件下的钻进和承台基坑开挖、降水、防护方案及承台大体积混凝土温控措施等施工难点及解决方案
The construction of bored piles on the south bank of Yangluo Yangtze River Bridge in Wuhan is introduced in this paper. The drilling and foundation pit excavation under special geological conditions, precipitation and protection schemes and the temperature control measures of mass concrete in cap are introduced. Difficulties and solutions