论文部分内容阅读
一九五一年宁夏水利春修工程计划,是由各县水利局在一月十五日以前作出初步预算,一月底以前省局审核批准,并于一月中旬开始备料的。为了统一全省的春工计划,省局又将各县预算汇编为省春工计划,以为施工中总的指导方针。这个总计划包括疏浚沟渠土工三、○八五、○○○公方,补修闸、坝、桥、涵等建筑物六一三座及渠道的护岸埽坝一一四一段,新修闸、坝、桥、涵等五四座及渠道的护岸埽坝六二段。共春工使用的主要物料为麦草四二○万公斤,块石八四四公方,片石一三、○三八公方,大小木椿四万余根。物料费总数
In 1951, the water conservancy project in Ningxia was started by the County Water Conservancy Bureau before January 15, with an initial budget approved by the provincial bureau prior to the end of January and preparation started in mid-January. In order to unify the province’s spring plan, the provincial government in turn compiled the county budget for the provincial spring plan, that the construction of the general guidelines. The master plan includes the dredging of ditches and ditches of geotechnical works for three, eighty-five and one hundred and eighty-five mansions, repair gates, dams, bridges and culverts, and other buildings, , Dam, bridge, culvert and other five or four and channel of bank protection dam six hundred and sixty. A total of spring workers to use the main material for 42 million kilograms of straw, block 844 square stones, stone tablets one hundred and thirty-three square, the size of more than 40,000 wooden root. The total cost of materials