论文部分内容阅读
本文结合包西铁路陕西段无缝线路铺设施工实践,就有碴轨道无缝线路铺设施工关键工序和技术控制进行了简要阐述。
Based on the practice of laying CWR in Shaanxi section of Baoxi Railway, this paper gives a brief exposition of the key processes and technical control of ballasted track CWR.