论文部分内容阅读
作为缓和日美贸易摩擦的一个组成部分,东京电力公司决定恢复在七十年代弃之不用的以煤炭为燃料的重力发电厂。已定于1987年在福岛盆地兴建一家电厂,1991年可以投产。
As part of a deal to ease the trade friction between Japan and the United States, Tokyo Electric Power Co. decided to resume a coal-fired heavy power plant that was abandoned in the 1970s. A power plant was scheduled to be built in the Fukushima Basin in 1987 and it can be put into production in 1991.