承包人将管理费作为施工成本的一部分,当删减合同约定工作发生时,将不可避免地影响工程造价费用中的施工成本。对删减合同约定工作引起的管理费的变化进行研究,能够有效地改善该事件引起的工程纠纷。在工程项目管理领域中,真正结合删减合同约定工作的补偿原因、方式、准则的管理费研究较为少见。因此,基于13清单规范,通过文献和国家现行法规,阐明删减合同约定工作引起管理费补偿原因及损失补偿机理,以供实际参考。
Contractor will be the management fee as part of the construction costs, when the reduction of the contract agreed to work, will inevitably affect the cost of construction costs in the project. The study on the change of management fee caused by the reduction of contractual work can effectively improve the engineering dispute caused by the incident. In the field of project management, the research on the management fees of the causes, modes and guidelines of the real compensation work that is combined with the contract of reducing or eliminating the contract is rare. Therefore, based on the 13 list specification, through the literature and the current laws and regulations of the state, clarify the reasons for the compensation for management fees and the compensation mechanism for loss caused by the reduction of contractual contract for practical reference.