新立煤矿44006工作面采用走向长壁后退式回采,回采工艺为炮采,全部垮落法管理顶板。工作面采用一台SGW-150刮板输送机,下顺槽采用一台SGW-40T刮板输送机和四台SPJ-800皮带运输机。回采本片盘时,采用双石墙工艺,预留排瓦斯巷,为下一片盘服务。施工过程中应解决选石、胶泥使用、砌筑、规格和尺寸、假巷的断面、假巷的密闭性等关问题。采用双石墙工艺预留排瓦斯巷后,不但少掘一条巷道,而且对瓦斯治理起到了很大作用。此方案技术上可行、经济上合理。
Xinli Coal Mine 44006 face back to the use of longwall mining, mining process for artillery mining, all roof collapse management. The work surface uses one SGW-150 scraper conveyor, one SGW-40T scraper conveyor and four SPJ-800 belt conveyors in the lower slot. The recovery of the film tray, the use of double-stone wall technology, reserve Pai Lane Lane, for the next piece of service. Construction process should be addressed in the selection of stone, clay use, masonry, size and size, section of the false lane, closed airtight lane and other related issues. Using dual stone wall technology to reserve row of gas lanes, not only less digging a roadway, but also played a significant role in gas treatment. This scheme is technically feasible and economically reasonable.