论文部分内容阅读
阐述了龙岩矿务局、永定矿务局及永 定化肥厂35kV电网结构存在的问题,提出了较为理想的改造方案,并对方案进行了分析讨论。
The problems existing in the structure of 35kV power grid in Longyan Mining Bureau, Yongding Mining Bureau and Yongding Fertilizer Plant are expounded. An ideal reform plan is put forward and the scheme is analyzed and discussed.