玉蜒桥于1987年9月15日开工,1988年12月25日竣工。该桥由各种结构型式的大小18座桥组成,总建筑面积为21681m~2,总造价约2155.6万元,是北京市东厢工程中施工规模最大的一座立交桥。施工中,领导有针对性地提出了“确保质量第一,坚持技术领先,加强科学管理,三联承包到底”的要求。其中“确保质量第一”是总目标;“坚持技术领先”是突出科学技术是第一生产力,意在依靠先进的施工技术求速度、求效益、保质量、保安全生产,它是“确保质量第一”的首要手段;“加
Jade Bridge was started on September 15, 1987, completed on December 25, 1988. The bridge by a variety of structural sizes of 18 bridges, with a total construction area of 21681m ~ 2, the total cost of about 21556000 yuan, is the construction of Beijing East Chamber project is the largest of a overpass. During the construction, the leaders put forward the requirements of “ensuring the quality first, adhering to the technology leadership, strengthening the scientific management and the triple contracting in the end” in a targeted manner. Among them, “to ensure quality first” is the overall goal; “Adhere to the technology leader” is to highlight science and technology is the primary productive force, intended to rely on advanced construction technology for speed, efficiency, quality assurance, security production, which is “to ensure quality First ”the primary means;" Plus