通过分析编组站计划信息的技术特征,说明列车到发信息、车流信息、调机作业时间信息等阶段计划编制依据的信息存在一定的不确定性,针对不同信息的不确定性对阶段计划编制和实施的影响,提出基于调度信息技术特征研究、阶段计划鲁棒优化方法和阶段计划调整优化方法3个层次的鲁棒阶段计划编制体系,并给出不同层次研究内容的技术方法,构建遵循鲁棒计划编制加基于数据的计划调整的编组站计划编制模式。
By analyzing the technical characteristics of the planning information of marshalling station, it shows that there is some uncertainty about the basis of train planning information such as train arrival and departure information, traffic flow information and operation time information. According to the uncertainties of different information, This paper proposes a robust stage plan system based on the research of dispatching information technology characteristics, stage plan robust optimization method and stage plan adjustment and optimization method, and presents the technical methods of different levels of research content, Planning The preparation of a Marshalling Station programming model based on data-based planning adjustments.