论文部分内容阅读
本文介绍一种用于12米柱距带悬挂吊车的单层工业厂房的装配整体连续梁板结构方案,以及为此方案所进行的一些试验。试验结果表明,这种方案用于工程实践是可行的,同时对多层框架结构的梁柱装配节点的改进,也有一定的参考价值。
This article describes a single-story industrial plant for the installation of a 12-meter pillar-to-belt suspension crane with an integrated continuous beam structure scheme and some tests for this scheme. The experimental results show that this scheme is feasible for engineering practice. At the same time, it also has certain reference value for the improvement of the beam-column assembly node of the multi-story frame structure.