论文部分内容阅读
由我院设计的大冶阳极精炼系统于2002年9月29日顺利点火投料进入试生产。该项目投资约6000万元,由2台240t回转式阳极炉、2套16模的双圆盘浇铸机组成,配有余热利用装置,这是目前国内首套投产运行的两炉两机和带余热锅炉的阳极精炼系统。该项目从圆盘定量浇铸机组引进设备谈判、工程设计、设备制造、安装调试到投料试生产历时仅8个月,是目前国内同类项目建设周期最短的。引进的双圆盘定量浇铸
Daye anode refining system designed by our hospital on September 29, 2002 successfully ignited feed into the trial production. The project invests about 60 million yuan and is composed of 2 sets of 240t rotary anode furnaces and 2 sets of 16-mode double disk casting machines with waste heat utilization device, which is the first set of two furnaces and two belts Anode refining system for waste heat boiler. The project from the disk quantitative casting unit introduction of equipment negotiation, engineering design, equipment manufacturing, installation and commissioning to feed trial production lasted only 8 months, is currently the shortest of similar projects in the country. The introduction of double disc quantitative casting