山西省轩岗矿务局焦家寨矿副立井井深309m,表土层厚52m,表土层以河床相砂卵石层和砂砾石层为主,采用降低水位法凿井。 四个降水孔是井心布孔一个,井外布孔三个。井心孔和井下巷道贯通,一孔二用,表土层施工做为泄水孔,基岩施工作为反井钻机导孔。井外三孔均布,安装潜水泵抽水,降低地下水水位。井心孔把降水后剩余的残余水柱部分涌水泄到井下,这样改善了井底工作面的劳动条件,井筒顺利地通过了表土层段。
Shanxi Province Xuan Gang Mining Bureau Jiaojiazhai mine shaft vertical well depth of 309m, topsoil thickness 52m, the surface layer of bed-phase sand and pebble layer and sand gravel layer, using the water level reduction sink shaft. The four precipitation holes are a hole in the heart of the hole, hole outside the hole three. Well core hole and underground tunnel through, one hole with two, topsoil construction as a scupper hole, bedrock construction as a guide hole drilling drills. Three wells were evenly distributed, the installation of submersible pump pumping, reducing groundwater level. Well core hole residual water after remaining part of the water column gushing down to the well, thus improving the working conditions of the bottom surface of the well, the wellbore smoothly through the topsoil section.