论文部分内容阅读
建筑安装施工项目工程直接费由材料设备费、机械使用费、人工费三部分组成,它是项目成本构成的主要部分。能否搞好对它的控制,对整个项目的盈亏起关键作用。本文就如何搞好这项工作,谈点粗浅的看法。 一、搞好施工图预算是前提 施工图预算是确定工程造价的文件,它是在施工设计阶段完成以后,以施工图为依据,根据国家颁发的预算定额、费用标准、以及地区工资等级、机械台班价
The construction and installation project directly consists of three parts: material and equipment fees, machinery use fees, and labor costs. It is the main part of the project cost structure. Whether it can do a good job of controlling it will play a key role in the profit and loss of the entire project. This article talks about how to do a good job in this work. First, do a good job in the construction plan budget is the premise Construction plan budget is a document to determine the project cost, it is after the completion of the construction design phase, based on the construction drawings, according to the state issued a budget quota, cost standards, and regional wage levels, machinery Taiwan Price