化工建设质量监督站成立

来源 :石油工程建设 | 被引量 : 0次 | 上传用户:duokuo1
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
化工建设质量监督站是根据国务院《关于改革建筑业和基本建设管理体制若干问题的暂行规定》及国家计委、建行总行、建设部等有关文件精神,为适应“八五”化工基本建设的需要,进一步加强化工建设的质量监督管理,强化工程质量意识,提高建设工程的质量水平而建立的。 The chemical construction quality supervision station is in accordance with the Provisional Regulations of the State Council on Several Issues Concerning the Reform of the Construction Industry and Infrastructure Management System and the related documents of the State Development Planning Commission, the Construction Bank Headquarters, and the Ministry of Construction to meet the needs of the “Eighth Five Year Plan” chemical construction. , Further strengthen the quality supervision and management of chemical construction, strengthen the awareness of project quality, and improve the quality of construction projects established.
其他文献
请下载后查看,本文暂不支持在线获取查看简介。 Please download and view, this article does not support online access to view profile.
建筑施工生产计划微机管理系统简称为—SCGL系统,是天津市二建公司积其多年的生产计划管理经验,开发研制的计算机管理系统。该系统的开发研制是在美国IBMPC-XT及其兼容机的
我公司是一个固定职工3500人的火电建筑安装综合企业。1984年开始推行企业内部经济承包责任制。八年来先后经历了两个阶段:第一阶段,对基层施工单位实行施工预算定额人工费
今年是国务院提出的质量、品种、效益年,建设部根据行业特点,强调施工企业要在质量、品种、效益年中,围绕着质量、工期、造价,不断提高企业效益,这是我们施工企业摆脱困境,
随着人民监督员制度的全面推行,笔者从人民监督员的选任方式、监督范围和监督程序等方面阐述了司法独立原则在人民监督制度下的具体体现。 With the full implementation of
八局工业设备安装公司是具有一级资质的综合性建筑安装企业,他们高度重视企业科技进步,坚持把施工现场作为科技进步的主战场,切实抓好科技成果的转化与应用,取得了可喜成绩
有色施工企业内部一期经济承包责任制和它对有色总公司的承包在时间上基本同步,到去年年底企业内部一期承包已告结束,今年二期承包已经开始。从一期承包的实施效果看,调动了
党的十三届七中全会通过了关于未来十年规划和“八五”计划的建议,提出要“坚定不移地贯彻执行国民经济持续、稳定、协调发展的方针。这条方针是我国四十一年来经济建设正反
黄庆平同志是中化总公司第三建设公司青年工程技术人员,自参加工作以来他刻苦钻研业务,工作积极主动,具有高度的自觉性和责任心,几年来他先后参加了上海石化总厂二期工程,扬
序号项目名称完成单位获奖等级二二T一B150型筒体沥青混凝土搅拌设备北京安惠立交桥工程设计与施工北京市城区及近郊区沥青路面典型结构组 合及LS一50厂拌沥青碎石作道路联结