秦皇岛煤码头三期工程,共有地面胶带输送机17条,胶带宽2m,带速4.8m/s,输送机最长1013m,配重最重50t。由于空间的限制,粘补维修等需起配重时~直是靠人力同时起3台千斤顶,修复完成后再同步落下。不仅每次起升需半天时间,而且由于起升落下不完全同步,曾造成工伤事故c
Qinhuangdao coal terminal three projects, a total of 17 ground conveyor belt, tape width 2m, belt speed 4.8m / s, conveyor maximum 1013m, the heaviest weight 50t. Due to space constraints, repair and other sticky to take up when the weight ~ straight from 3 people at the same time by the jack, repair and then resumed after the completion of the fall. Not only for each half a day to rise, but also due to the rise and fall is not fully synchronized, has caused accidents C