论文部分内容阅读
随着600MW机组的不断兴建、成熟,各种典型设计也相继涌出,这就要求我们同样能有一个典型安装措施来快速完成安装。因此,东方锅炉作为一个锅炉典型设计,同样需要我们有一个典型的热控安装措施来提高我们的安装效率。目前,行业竞争严重,工期也在不断压缩,使我们安装工作增加了很大难度,同时也对我们提出了更高的要求,作为技术人员落在我们肩上的任务更加艰巨,这就要求我们不断学习、总结、创新,互相学习借
With the constant construction and maturity of 600MW generating units, a great variety of typical designs are also coming out. This requires that we also have a typical installation to complete the installation quickly. Therefore, the East boiler as a typical boiler design, also need us to have a typical thermal control installation measures to improve our installation efficiency. At present, the serious competition in the industry and the continual compression of the construction period have made it very difficult for us to install the work. At the same time, it has also raised higher demands on us. As the task of technicians falling on our shoulders becomes more arduous, this requires us Constantly study, summarize, innovate and learn from each other