论文部分内容阅读
在对炼钢厂钢包转运过程进行解析中,给出了钢包运行时间因素的数学描述,提出钢包转运过程的“柔性时间”概念和钢包使用个数的计算方法.同时,对钢包运行的优化进行了分析,建立了钢包转运的物理模型.
In the analysis of ladle transit process in steel mills, the mathematical description of the ladle running time factor is given, and the calculation method of “flexible time” and the number of ladle used in the ladle transit process are proposed. At the same time, the optimization of ladle operation was analyzed and the physical model of ladle transit was established.