论文部分内容阅读
1988年10月27日,水利部部长扬振怀和长江口及太湖流域综合治理领导小组组长王林等领导同志专程来上海,同朱镕基市长共同为苏州河闸桥工程的开工剪彩,标志着上海市防汛墙加固工程进入了一个新的历史阶段。一、工程规模该工程面广量大,主要工程项目包括:1.黄浦江干、支流上208公里防汛墙加高加固工程。黄浦江干流浦江侧从吴淞口至淀浦河长47公里,吴泾、闵行两段长18公
On October 27, 1988, Yang Zhenhuai, minister of the Ministry of Water Resources, and Wang Lin and other leading comrades of the Yangtze River Mouth Basin and the Leading Group for Integrated Taihu Basin Management made a special trip to Shanghai to work together with Mayor Zhu Rongji to start the ribbon cutting project for the Suzhou River Gap Bridge Project. With the Shanghai flood wall reinforcement project has entered a new historical stage. First, the scale of the project A large number of large-scale projects, major projects include: 1. Huangpu River, 208 km on the tributaries of the flood control and reinforcement works. Pujiang River from the side of the Huangpu River mainstream Wusongkou Dingpu River 47 km long, Wujing, Minhang two sections 18