论文部分内容阅读
1 问题的提出任何建设项目后评价都是项目管理过程中的最后一个阶段。我国的后评价工作始于80年代初,目前处于起步探索阶段。移民安置是水利工程建设过程中一个重要的组成部分,由于移民工程具有自身的特点,其后评价的内容和主体工程相差较大;从仅有的几个水利项目后评价案例看,其移民安置后评价不具备系统的、符合移民安置特点的理论和分析方法,其评价内容不全面、不系统,评价指标也很少。结合当前水利工程后评价的发展趋势和即将进行的小浪底移民安置后评价需要,研究移民安置后评价的核心内容之一——移民安置效果后评价具有理论和现实意义。
1 PROBLEM PROPOSAL Any post-construction project evaluation is the last stage in the project management process. Post-evaluation work in our country started in the early 1980s and is currently in its infancy. Resettlement is an important part of the construction of water conservancy projects. Since the resettlement projects have their own characteristics, the content of the evaluation differs greatly from that of the main project. Judging from the few cases of post-evaluation of water conservancy projects, the resettlement The post-evaluation does not have systematic and theoretical and analytical methods that are in line with the characteristics of resettlement. The contents of the evaluation are not comprehensive, not systematic, and there are few evaluation indexes. Combining with the development trend of post-evaluation of current water conservancy projects and the upcoming post-resettlement post-resettlement needs assessment, it is of both theoretical and practical significance to study post-resettlement post-evaluation one of the core contents of resettlement post-evaluation.