论文部分内容阅读
【摘要】随着科技的发展,大型机电设备得到了跨越式的进步,给国家的社会和经济发展起到了促进的作用。与此同时,大型机电设备的安装和过去相比,也有着更高的要求。在本文中,笔者将结合个人的经验,并且从多个方面入手,就安装的费用预算,安装工作的组织、整个安装之前的技术培训以及设备的技术验收、设备的安装和调试等等方面对大型机电设备的安装调试进行论述。
【关键词】大型机电设备;安装调试;管理
Installation Technology Analysis of Large - scale Electromechanical Equipment
Zhou Wen-yuan
(Guizhou Construction Engineering Environmental Engineering Co., LtdGuiyangGuizhou550001)
【Abstract】With the development of science and technology, large-scale mechanical and electrical equipment has been a leap-forward progress, to the country's social and economic development has played a role in promoting. At the same time, large-scale mechanical and electrical equipment installation and the past compared to also have a higher demand. In this article, the author will combine the personal experience, and from a number of aspects of the installation of the cost of the budget, the installation of the organization, the entire installation of technical training and equipment, technical acceptance, equipment installation and commissioning, etc. Large-scale mechanical and electrical equipment installation and commissioning to discuss.
【Key words】Large - scale electromechanical equipment;Installation and commissioning;Management
现在的大型机电设备和过去相比,不仅仅体积更加的庞大,并且配套机组以及其他的附属设备也更加的多,更重要的是技术非常的密集,这些因素都直接导致了整个安装调试会变得非常复杂。基于此,大型机电设备的使用企业,让每个技术人员都对安装调试的方法更加的了解是非常必要的,并且对之后机械的管理程序也应该有一个非常全面的了解。唯有这样做,才能在物力分配、组织人力上更加合理,这些都是大型机电设备安装调试工作胜利完成的先决条件。笔者结合一些大型的机电设备,详细的介绍大型机电设备的安装技术。
1. 对整个安装调试过程中产生的费用进行预算
1.1运输费。
运输费是一个重要的环节,所以产生的费用也是不能忽视的,机务部门应该依照大型机电设备,实际的体积质量以及在进行了拆分和装运之后各个部位的总数量,在从实际出发去安排具体的运输车辆,不仅仅如此,还应该详细的确定每辆车每次运输多少,具体运输时间是什么。计算费用的时候,还应该考虑的更周全,装卸和捆扎所产生的费用也应该考虑在内。这些费用在运输的过程中是不可避免的。
1.2安装费。
不同的设备,在安装的时候产生的费用也是不同的,在安装的时候,由于大型机电都不一样,有不同的信号,详细的预算是必须的计算出来的,比如基座的建设的费用,建造砌筑台需要的材料,比如木材,水泥,铁丝,铁件等等材料。安装过程中使用的吊装设备,人工使用量以及小型机具的使用,都应该根据工程预算定出价格,最后在计算出预算的费用。
1.3调试费。
调试大型机电设备是一个非常复杂的过程中,应重点考虑的应该是材料的费用,比如燃油,煤,电等等。同时还包括一些加工工程中会使用到的材料,比如碎石,水泥,沥青以及砂石等。就第一次使用的进口设备来说,应该通过多个小时的空载,负载以及连续或者间断的生產达到考核的目的。所以,实际操作的人员应该十分的注意工程材料的储备。大型机电设备的调试费主要有一下几个方面组成:燃油费或者是电力费,配套机械费、人工费,工程材料费等等。每个部分的费用都应该根据各自的单价以及具体的用量进行计算。不仅仅如此,配套的机械,人员的调配和管理以及消耗材料的准备都应该做好。同时还有一些其它的费用,比如设备刚到时的看管费等等,其它的一些费用的预算也要结合具体的情况进行预算。
2. 人员的技术培训和组织
2.1现在国内的大型机电设备越来越精密,价格也不菲,所以在第一次安装调试的时候,设备的技术工作应该交给供应厂商派遣过来的技术人员进行负责。作为大型机电设备的购买单位,如果想让整个的调试过程更加的顺利,详细的工作计划必须制定好。如果设备提供商派遣的工程师没有到达现场,第一个要做的工作就是操作人员的挑选,精心的建立协调工作组的建立,这个工作小组的组成应该不仅仅由负责的行政管理的领导,更应该由负责机械技术的领导一起组成。同时,在整个的调用安装工作中使用一些必要的工具。 2.2选配操作人员是一项非常重要的工作:(1)选配的工作人员必须业务非常熟练,有较多的机械的常识,反应相对于其他人员更加的灵活;(2)责任心对调试安装过程也是非常重要的,因此选择的人员必须具有很强的责任心;(3)如果机电设备主要应用了电或者计算机这些技术,在选配人员的时候,就应该注重具有这些技术背景人员的选择,应该选择学历较高同时责任心非常强的技术人员作为领导;(4)购买的单位的技术负责人也该全力的配合、帮助厂商的安装调试工程师的工作。不仅仅如此,任何一个操作人员都知道操作的的方法和自己具体的职责。培训的目的是让实际的操作人员能够全面详细的熟悉待调设备的工作原理,性能以及具体的操作过程,还有在设备安装以后具体的管理办法,还有不能忽视的非常重要的安全注意事项等,通过有效的培训可以让他们心中有数,不会应该对设备不熟悉,造成损失。
3. 安装施工
一般来说,大型机电设备的安装会根据机器不同,过程也会有所不同,但是主要包括:基座的安装施工、安装工作前的准备、备安装等三个方面。
3.1基座的施工。
对基座进行施工的时候,对設备具体的确定和安装位置选择应该是精心设计的,并且规划一个相对合理的布局。那么在测量放线、场地测量、砌筑基座这些必要的阶段。严格的执行具体的技术规范是非常必要的。
3.2准备工作。
任何大型机电设备的安装,在实施安装之前,质量的检查的实施都是必须的。列如:所有螺栓以及螺母的质量,是否有松动的情况出现;在进行焊接件的时候,焊缝的地方是否出现了裂纹以及气孔等等缺陷。运输燃润油,运输水以及运输气的的管道的焊接的是否可靠。如果有泄漏情况能否快速察觉;电路的布设是否整齐。设备的绝缘性是否达到标准。旋转或者是往复运动部位启动是否灵敏,是否安全可靠等等。不仅仅如此,机具以及材料的准备时候齐全,应该进行进一步的检查。
3.3安装。
在进行大型机电设备安装的时候,对设备主机的部件以及每个附属设备进行随时的质量检查是有必要的。设备的安装现场应该派遣一个专门的负责人,进行现场的指挥。进行高空作业在右的时候是不可避免的,同时安装、吊装笨重装置很多的时候也是安装的一个组成部分。因此,必要的安全防范措施应该并且是有必要采取的。在施工场地上的安装人员应该遵行安全规范,佩带安全帽。安装工作应该按照事先安排顺序实施。如果随意施工,每个操作点就位就会相对的困难。同时安装工作,需要分工进行。例如:机械部分的安装,必须由机械人员进行执行,而电气部分的安装调配,则必须由电气人员全权负责。安装工作完成之后,也应该对设备的完整性进行检查,安全性以及合理性检查是非常有必要的。
4. 调试
4.1调试安装的过程。
按照经验来看,大型机电设备,使用之前,如果进行总的安装,或者进行负荷试验都是很难得到具体的数据。甚至是已经投入过使用的设备,由于拆卸,再次进行安,还有搬运过程中所出现的各种情况,所以机械很难和原来的安装状态保持一致。因此,即使是安装好就要投入到使用的大型机电设备,调试工作也是极其重要的一环。参加到调试的工作的人员应该深刻的认识调试工作的重要性。调试工作都是是一个具体详细的工作过程。在机械的调试之前。参加工作的人员首先要全面的检查设备,完整性,和说明书描述的符合性,安全性是否可靠,是否出现了渗漏等等。这些必要的工作是必须执行的,这样调试顺利的进行才有了保障。在进行调试的时候,首先要检查的的是机器的工作质量,经济性能以及性能指标等等。在进行的考核的时候,在施工的现场空负荷以及负荷试验是需要进行的,只有进行这些试验检验机械性能的结果,才能合理可靠,同时对于机械的技术要求是否达到技术标准的检测才能准确。调试的过程。每一个参加调试的工作技术人员应该在一直留在现场。同时,应该积极的对设备技术发展状况有所了解,在进行调试程序的时候,具体方法工作人员必须进行全面的了解。不仅仅如此,参与调试的技术人员对整个调试过程都应该进行详实的记录,原始记录对日后设备的正确使用有这非常有着非常重要的作用。
4.2撰写安装调试技术报告。
(1)大型机电设备在顺利的完成初次安装调试工作的时候,还有一个非常重要的工作就是撰写安装调试技术报告,报告是进行验收的必须重视的一个爱聊,因此必须做好报告的撰写。安装调试报告第一项的要求就是详细,只有详细的报告才能让读者可以全面的了解机电设备安装的整个过程。机电设备的调试技术报告不应该是一个简单的报告,更应该是一个科技文件。因此,整个报告的内容和其他报告相比应该是专深并且具体的,因此每个调试人员对报告的重要意义都必须有深刻的认识。
(2)任何一个参与到调试的人员,在进行报告撰写的时候,都应该独立,不应该相互借鉴,也要注意到技术报告和普通的论文的不同之处,详略应该得当,主次应该分明,如果只是泛泛而谈,很有可能会让读者难以领会。
5. 技术验收
能否成功的安装调试大型机电设备安装,其标准应该是在安装和调试之后的考核的结果。并且,也应该考核经济和技术性能和合同里面的相符度。一个不能忽视的过程,就是整个安装调试过程中对数据的记录,通过分析这些具体的数据记录以及技术报告。就可以决定设备的安装是否达到标准,是否通过验收。只有技术验收达到标准之后,资产手续以及财务手续就可以进行办理了。要是设备没有顺利的通过技术的验收,入账是不允许的,投入使用更是被禁止的。如果不合格的设备投入受用造成责任的可能性就非常的大。大型机电设备在安装以及调试的整个过程中出现的、以及难以解决的问题,进行认真有效的总结是非常有必要的,对于所出现的问题的责任应该分清,并且进行及时处理。对于索赔事宜。也应该尽快的处理。
参考文献
[1]李建新.浅析机电安装工程的项目管理[J].科技致富向导.2013(9).
[2]李俊.浅谈机电安装工程的项目管理[J].华章,2012(33).
[3]祁晓玲.建筑机电安装工程施工技术探讨[J].门窗,2012(11).
[4]段腾飞.浅谈机电安装工程管理的问题与对策[J].电站系统工程,2012(4) .
[5]金娟,金东旭,王庆.浅析机械设备的施工管理和安全管理[J].现代商业,2012(15).
[6]张宏洁.加强施工机械设备管理与维护的建议[J].中国新技术新产品,2012(10).
[7]章少宏.论述建筑机电设备安装项目管理[J].门窗,2012(5).
[8]于政强.大型施工机械设备资源管理研究[J].科技创新导报,2012(13).
【关键词】大型机电设备;安装调试;管理
Installation Technology Analysis of Large - scale Electromechanical Equipment
Zhou Wen-yuan
(Guizhou Construction Engineering Environmental Engineering Co., LtdGuiyangGuizhou550001)
【Abstract】With the development of science and technology, large-scale mechanical and electrical equipment has been a leap-forward progress, to the country's social and economic development has played a role in promoting. At the same time, large-scale mechanical and electrical equipment installation and the past compared to also have a higher demand. In this article, the author will combine the personal experience, and from a number of aspects of the installation of the cost of the budget, the installation of the organization, the entire installation of technical training and equipment, technical acceptance, equipment installation and commissioning, etc. Large-scale mechanical and electrical equipment installation and commissioning to discuss.
【Key words】Large - scale electromechanical equipment;Installation and commissioning;Management
现在的大型机电设备和过去相比,不仅仅体积更加的庞大,并且配套机组以及其他的附属设备也更加的多,更重要的是技术非常的密集,这些因素都直接导致了整个安装调试会变得非常复杂。基于此,大型机电设备的使用企业,让每个技术人员都对安装调试的方法更加的了解是非常必要的,并且对之后机械的管理程序也应该有一个非常全面的了解。唯有这样做,才能在物力分配、组织人力上更加合理,这些都是大型机电设备安装调试工作胜利完成的先决条件。笔者结合一些大型的机电设备,详细的介绍大型机电设备的安装技术。
1. 对整个安装调试过程中产生的费用进行预算
1.1运输费。
运输费是一个重要的环节,所以产生的费用也是不能忽视的,机务部门应该依照大型机电设备,实际的体积质量以及在进行了拆分和装运之后各个部位的总数量,在从实际出发去安排具体的运输车辆,不仅仅如此,还应该详细的确定每辆车每次运输多少,具体运输时间是什么。计算费用的时候,还应该考虑的更周全,装卸和捆扎所产生的费用也应该考虑在内。这些费用在运输的过程中是不可避免的。
1.2安装费。
不同的设备,在安装的时候产生的费用也是不同的,在安装的时候,由于大型机电都不一样,有不同的信号,详细的预算是必须的计算出来的,比如基座的建设的费用,建造砌筑台需要的材料,比如木材,水泥,铁丝,铁件等等材料。安装过程中使用的吊装设备,人工使用量以及小型机具的使用,都应该根据工程预算定出价格,最后在计算出预算的费用。
1.3调试费。
调试大型机电设备是一个非常复杂的过程中,应重点考虑的应该是材料的费用,比如燃油,煤,电等等。同时还包括一些加工工程中会使用到的材料,比如碎石,水泥,沥青以及砂石等。就第一次使用的进口设备来说,应该通过多个小时的空载,负载以及连续或者间断的生產达到考核的目的。所以,实际操作的人员应该十分的注意工程材料的储备。大型机电设备的调试费主要有一下几个方面组成:燃油费或者是电力费,配套机械费、人工费,工程材料费等等。每个部分的费用都应该根据各自的单价以及具体的用量进行计算。不仅仅如此,配套的机械,人员的调配和管理以及消耗材料的准备都应该做好。同时还有一些其它的费用,比如设备刚到时的看管费等等,其它的一些费用的预算也要结合具体的情况进行预算。
2. 人员的技术培训和组织
2.1现在国内的大型机电设备越来越精密,价格也不菲,所以在第一次安装调试的时候,设备的技术工作应该交给供应厂商派遣过来的技术人员进行负责。作为大型机电设备的购买单位,如果想让整个的调试过程更加的顺利,详细的工作计划必须制定好。如果设备提供商派遣的工程师没有到达现场,第一个要做的工作就是操作人员的挑选,精心的建立协调工作组的建立,这个工作小组的组成应该不仅仅由负责的行政管理的领导,更应该由负责机械技术的领导一起组成。同时,在整个的调用安装工作中使用一些必要的工具。 2.2选配操作人员是一项非常重要的工作:(1)选配的工作人员必须业务非常熟练,有较多的机械的常识,反应相对于其他人员更加的灵活;(2)责任心对调试安装过程也是非常重要的,因此选择的人员必须具有很强的责任心;(3)如果机电设备主要应用了电或者计算机这些技术,在选配人员的时候,就应该注重具有这些技术背景人员的选择,应该选择学历较高同时责任心非常强的技术人员作为领导;(4)购买的单位的技术负责人也该全力的配合、帮助厂商的安装调试工程师的工作。不仅仅如此,任何一个操作人员都知道操作的的方法和自己具体的职责。培训的目的是让实际的操作人员能够全面详细的熟悉待调设备的工作原理,性能以及具体的操作过程,还有在设备安装以后具体的管理办法,还有不能忽视的非常重要的安全注意事项等,通过有效的培训可以让他们心中有数,不会应该对设备不熟悉,造成损失。
3. 安装施工
一般来说,大型机电设备的安装会根据机器不同,过程也会有所不同,但是主要包括:基座的安装施工、安装工作前的准备、备安装等三个方面。
3.1基座的施工。
对基座进行施工的时候,对設备具体的确定和安装位置选择应该是精心设计的,并且规划一个相对合理的布局。那么在测量放线、场地测量、砌筑基座这些必要的阶段。严格的执行具体的技术规范是非常必要的。
3.2准备工作。
任何大型机电设备的安装,在实施安装之前,质量的检查的实施都是必须的。列如:所有螺栓以及螺母的质量,是否有松动的情况出现;在进行焊接件的时候,焊缝的地方是否出现了裂纹以及气孔等等缺陷。运输燃润油,运输水以及运输气的的管道的焊接的是否可靠。如果有泄漏情况能否快速察觉;电路的布设是否整齐。设备的绝缘性是否达到标准。旋转或者是往复运动部位启动是否灵敏,是否安全可靠等等。不仅仅如此,机具以及材料的准备时候齐全,应该进行进一步的检查。
3.3安装。
在进行大型机电设备安装的时候,对设备主机的部件以及每个附属设备进行随时的质量检查是有必要的。设备的安装现场应该派遣一个专门的负责人,进行现场的指挥。进行高空作业在右的时候是不可避免的,同时安装、吊装笨重装置很多的时候也是安装的一个组成部分。因此,必要的安全防范措施应该并且是有必要采取的。在施工场地上的安装人员应该遵行安全规范,佩带安全帽。安装工作应该按照事先安排顺序实施。如果随意施工,每个操作点就位就会相对的困难。同时安装工作,需要分工进行。例如:机械部分的安装,必须由机械人员进行执行,而电气部分的安装调配,则必须由电气人员全权负责。安装工作完成之后,也应该对设备的完整性进行检查,安全性以及合理性检查是非常有必要的。
4. 调试
4.1调试安装的过程。
按照经验来看,大型机电设备,使用之前,如果进行总的安装,或者进行负荷试验都是很难得到具体的数据。甚至是已经投入过使用的设备,由于拆卸,再次进行安,还有搬运过程中所出现的各种情况,所以机械很难和原来的安装状态保持一致。因此,即使是安装好就要投入到使用的大型机电设备,调试工作也是极其重要的一环。参加到调试的工作的人员应该深刻的认识调试工作的重要性。调试工作都是是一个具体详细的工作过程。在机械的调试之前。参加工作的人员首先要全面的检查设备,完整性,和说明书描述的符合性,安全性是否可靠,是否出现了渗漏等等。这些必要的工作是必须执行的,这样调试顺利的进行才有了保障。在进行调试的时候,首先要检查的的是机器的工作质量,经济性能以及性能指标等等。在进行的考核的时候,在施工的现场空负荷以及负荷试验是需要进行的,只有进行这些试验检验机械性能的结果,才能合理可靠,同时对于机械的技术要求是否达到技术标准的检测才能准确。调试的过程。每一个参加调试的工作技术人员应该在一直留在现场。同时,应该积极的对设备技术发展状况有所了解,在进行调试程序的时候,具体方法工作人员必须进行全面的了解。不仅仅如此,参与调试的技术人员对整个调试过程都应该进行详实的记录,原始记录对日后设备的正确使用有这非常有着非常重要的作用。
4.2撰写安装调试技术报告。
(1)大型机电设备在顺利的完成初次安装调试工作的时候,还有一个非常重要的工作就是撰写安装调试技术报告,报告是进行验收的必须重视的一个爱聊,因此必须做好报告的撰写。安装调试报告第一项的要求就是详细,只有详细的报告才能让读者可以全面的了解机电设备安装的整个过程。机电设备的调试技术报告不应该是一个简单的报告,更应该是一个科技文件。因此,整个报告的内容和其他报告相比应该是专深并且具体的,因此每个调试人员对报告的重要意义都必须有深刻的认识。
(2)任何一个参与到调试的人员,在进行报告撰写的时候,都应该独立,不应该相互借鉴,也要注意到技术报告和普通的论文的不同之处,详略应该得当,主次应该分明,如果只是泛泛而谈,很有可能会让读者难以领会。
5. 技术验收
能否成功的安装调试大型机电设备安装,其标准应该是在安装和调试之后的考核的结果。并且,也应该考核经济和技术性能和合同里面的相符度。一个不能忽视的过程,就是整个安装调试过程中对数据的记录,通过分析这些具体的数据记录以及技术报告。就可以决定设备的安装是否达到标准,是否通过验收。只有技术验收达到标准之后,资产手续以及财务手续就可以进行办理了。要是设备没有顺利的通过技术的验收,入账是不允许的,投入使用更是被禁止的。如果不合格的设备投入受用造成责任的可能性就非常的大。大型机电设备在安装以及调试的整个过程中出现的、以及难以解决的问题,进行认真有效的总结是非常有必要的,对于所出现的问题的责任应该分清,并且进行及时处理。对于索赔事宜。也应该尽快的处理。
参考文献
[1]李建新.浅析机电安装工程的项目管理[J].科技致富向导.2013(9).
[2]李俊.浅谈机电安装工程的项目管理[J].华章,2012(33).
[3]祁晓玲.建筑机电安装工程施工技术探讨[J].门窗,2012(11).
[4]段腾飞.浅谈机电安装工程管理的问题与对策[J].电站系统工程,2012(4) .
[5]金娟,金东旭,王庆.浅析机械设备的施工管理和安全管理[J].现代商业,2012(15).
[6]张宏洁.加强施工机械设备管理与维护的建议[J].中国新技术新产品,2012(10).
[7]章少宏.论述建筑机电设备安装项目管理[J].门窗,2012(5).
[8]于政强.大型施工机械设备资源管理研究[J].科技创新导报,2012(13).