【摘 要】在水利水电工程建设中,基础灌浆技术的应用日趋广泛,但是对于施工管理有着严格的要求,必须符合相关的技术规范要求,还要满足工程建设的基本条件。因此,加强对灌浆施工技术的研究对于提高水利水电工程建设质量意义重大。本文结合个人工作经验对基础灌浆技术在水利水电工程中的应用进行论述,为相关工作者提供借鉴。
【关键词】水利水电;基础;灌浆;技术
Discussion on grouting and foundation construction of water conservancy and hydropower project
Yang Fei
(Xinjiang Changyuan Water Group Yili Local Electric Power Co., Ltd Yining Xinjiang 835000)
【Abstract】In the construction of water conservancy and hydropower projects, the application of basic grouting technology is becoming more and more extensive, but it has strict requirements for construction management, must meet the relevant technical requirements, but also meet the basic conditions of construction. Therefore, it is of great significance to strengthen the research on grouting construction technology to improve the quality of water conservancy and hydropower project construction. This paper discusses the application of basic grouting technology in water conservancy and hydropower project with personal work experience, and provides reference for relevant workers.
【Key words】Water conservancy and hydropower;Foundation; grouting;Technology
水利水电工程是我国的重要的基础建设之一,基础建设工程是水利水电工程建设的重要组成部分,由于水利水电工程对基础工程的设置相对严格,采用灌浆施工技术能够保证水利水电工程建筑基础具有较强的抗震以及防渗性能,这对保证水利水电基础工程的质量具有至关重要的作用。
1. 水利水电工程建筑基础灌浆施工的目的和意义
(1)第一,因为建筑基础受到的水压力较大,由于渗流产生的巨大压力会使建筑基础不够牢固,且建筑基础的稳定性也会受到很大影响,要是没有正确采取防渗措施,则建筑基础的稳定性和强度都会下降,不利于安全施工。
(2)第二,在水利水电工程中,建筑基础对整个水利水电工程涞水都是十分重要的,其建筑造型、地址的选取以及施工对质量要求极高,若不能严格执行,建筑基础质量达不到要求,功能难以发挥。
(3)第三,实施水利水电工程时,要是忽视对建筑基础采取防渗措施,则建筑有可能出现塌陷,危及到下游居民的人身财产安全。
(4)第四,建筑基礎在整个水利水电工程中是至关重要的,且耗费较大。要是进行施工时,防渗工作不到位,则会影响建筑基础的质量,对经济效益造成损害,还会使资源得不到有效利用。
2. 水利水电工程建筑基础灌浆施工技术分析
2.1 普通灌浆加固技术。
一般而言,水坝基础灌浆、坝体上游区域固结灌浆、水坝体帷幕灌浆等技术都属于普通灌浆加固技术。然而下面几个问题都是在普通灌浆施工过程中必须注意的:
(1)准备阶段:做好灌浆准备,记录相关数据,将水位降低至所需的高度。
(2)清洗:清洗的工作包含清洗裂缝和清洗灌浆孔两部分内容。在还没有开始施工时,孔壁、孔底必须彻底冲洗干净,而且灌浆段要保持77%以下的稳定水压,冲洗的时长必须以孔洞的深浅以及水的清浊情况为依据进行判定。
(3)进行灌浆时,基本原理为先稀后浓,循序渐进,标准是水压力,渐渐增加浆液到一定浓度。除此之外,水灰要保持一定的配比,还可以通过添加铝粉和石英粉等调整灌浆浆液的浓度。在进行灌浆时,通过使用壁可灌浆技术提高其稳定强度,利用橡皮管的弹性的收缩压力进行自动注浆,接着提高灌浆的压力,将空气压进混凝土的毛细管当中,接着通过借助混凝土自然呼吸的作用彻底排除空气,尽可能保持畅通,提高管控质量。通过这种方式,一方面渗透效果会更好,另一方面施工时间减少,修补成本也相应降低。
2.2 化学灌浆施工技术。
化学灌浆技术是帷幕防渗透和堵漏防水的一项重要技术,在灌浆时该技术不仅能发挥加固的作用,而且还能有效的修复裂缝。现在,修建大坝、水库以及船闸等工程中都已经普遍运用了化学灌浆技术,在防渗透中发挥了有效的作用。除此之外,核电站基础加固、止水封闭也使用了这种技术,还充分运用在防堤坡和码头加固等方面。
(1)化学灌浆泵的类型。
不同的驱动方式会造成化学灌浆泵的针对面存在差异,以驱动进行划分包括电动、手动、液压以及气动泵。以灌浆方式进行划分包括双液混合泵和泵前双液混合泵两种。以不同使用地点划分为岩床化学泵和裂缝化学泵。进行施工时,稳定的压力是前提,保持可控的施工。以不同的化学灌浆泵压力划分为闭环控制式、开环、闭环L20控制、闭环比例控制四种。 (2)化学灌浆技术的优点。
在各种环境中都可以运用化学灌浆技术,且稳定无公害。其具有良好的适应性,施工成本低廉。后期的化学浆原料和施工设备都具有较高的水平,可以广泛运用于各类型的施工中。现在,我国各个施工领域基本已经认同化学灌浆技术,施工技术相对来说已经达到成熟的地步。
2.3 高压喷射灌浆防渗透技术。
相比一般的施工技术,开挖量小、工程造价不高、施工便捷等是高压喷射灌浆技术的优势。因为这种技术不需要占用太大的面积,所以对周边环境的影响不大。利用这些技术施工不但可以有效增强堤坝的防渗透能力,还能缓解洪水带来的压力。
(1)钻孔施工。
进行钻孔时,必须对漏堵进行填充,在进行施工时,同时进行套管和钻进的工作,以保持正常的孔循环。在进行钻孔时,钻孔角度必须保持垂直,且必须保持低于1%的偏斜率。在向下植入喷射管的过程中,利用泥浆固壁钻孔放置到钻孔孔洞的底部。
(2)在进行高压喷射灌浆时,若采用不同的喷射方法,则相应的基础参数也会存在差异。
无论在哪一种地质环境中,使用同一种灌浆方法,水压、浆压以及气压都会保持一致。随着底层的变化,灌浆速度也会相应的加快或放慢。通常,砂卵石地区灌浆速度会变慢,砂质环境灌浆速度会加快。而在实际灌浆的过程中,首先可以利用对先序孔的速度进行加快,再把后序孔的速度保持在较慢的水平。这样一来,如果孔中反浆量减少,则可以相应放慢加快速度。在进行施工时,灌浆速度、灌浆压力以及灌浆开进速度必须保持在一定的范围内。经过实践检验可知,通过高压喷射灌浆这种施工技术对水库的安全性可以大大提高,有利于稳定建筑基础,保持牢固的建筑基础。
2.4 无塞灌浆施工技术。
无塞灌浆施工技术同样是水利水电工程基础建筑施工中最常见的技术之一,其原理是采用自上而下灌浆的方式,这样不仅能够进行循环的灌浆,而且不需要等待凝固就能够节能型下一道工序的施工,因此该项灌浆技术被广泛的应用在现代水利水电工程基础建筑施工中。水利水电工程基础建筑施工在采用无塞灌浆施工技术时应该注意以下几个方面:
(1)钻孔施工,在进行钻孔施工的过程中,钻孔的长度应该控制在150cm~250cm之间,宽度应该控制在75mm左右,当钻孔施工结束之后,应该用水将孔内的残渣清除干净,当孔干燥之后进行灌浆施工;
(2)浆液的制备,无塞灌浆施工技术采用的浆液通常是由水、粉煤灰、水泥以及外加剂等混合制成的,在进行浆液拌合施工的过程中,应该严格的控制浆液的含水量,通常状况下,浆液的含水量控制在30%左右,当浆液制成之后还应该进行养护,以此保证浆液的保水性、可泵性以及和易性;
(3)选择注浆管,无塞灌浆施工采用的注浆管通常为无缝钢管或者钻杆,然后将内壁和注浆管之间的空隙当作回浆管,用于灌浆的循环;
(4)灌浆施工,当准备好上述所有的工序之后进行灌装施工,将回浆管插入之后进行灌浆,然后通过回浆管进行循环灌浆。
3. 如何强化水利水电工程灌浆施工管理
(1)首先,加强优质水利水电工程灌浆子系统的管理和控制。因为在水利水电灌浆施工工程中,其环节控制包括灌入水平处理以及可塑性控制,关于其控制标准则依照其工程的具体特性的不同而呈现不同状态。因此,根据预定管理标准做好浆材的科学筛选是实现控制阶段的重要依据。根据水利水电工程实施的实际情况,合理科学的做好选择,同时加强优质水利水电工程项目的灌浆管理效力,只有这样才能够对其工程建设质量提供有效的保障。而对于灌浆定理而言,其要求主要包括有劈裂定向判别、尺寸效应以及吸渗反应等等。其中尺寸效应则也就是浆材粒径尺寸必须要在被灌对象孔隙和缝洞标准宽度之下,只有这样才能够满足浆材对孔洞尺寸效应的要求。而在实施劈裂灌浆施工阶段中,载体中所具有的水力劈裂作用可以采用数值方式进行表示,同时还能够合理的判定其属性。当水头和流量的关系为平方根函数的时候,其渗流表现则也就是紊流水平,这一情况的出现也就说明裂隙出现阻塞。如果水流变化增长是在流量提升之下,则也就代表渗流断面出现扩充。吸渗作用主要是指化学浆液对低渗透介质产生侵蚀作用时,借助于浆液对载体所具有的亲和力影响和润湿作用,也就会是主体渗透方式形成该作用。
(2)其次,是不断对水利水电费用程序加强管控。对于工程项目人员来讲,必须要对不断的对其控制理念优化,以有效降低灌浆施工的投入成本为首要前提,不断的讲和具体施工相适应的施工技术引入应用在工程中,制定出最佳施工方案,依照其具体灌浆体系实施科学管控。在明确施工控制方向目标的基础上,不断完善水利水电工程费用体系的管控,进而有效增强成本控制的结果。
4. 结束语
综上所述,当前我国灌浆施工技术管理在水利水电工程建筑基础中的应用等方面的问题难度比较大,耗费时长较长,同时,外部客观原因影响较大。因而进行水利水电工程建筑基础灌浆施工技术管理的时候必须符合相关的制度规范,减少客观因素的影响。做好灌浆施工技术管理在水利水电工程建筑基础中的应用是非常必要的。不仅如此,在对水利水电工程建筑基础灌浆施工技术管理中,科学设置施工计划,对施工的过程数据进行正确的分析,提高管理的预见性,防止由于灌浆施工技术管理在水利水电工程建筑基础中的应用等问题的影响而威胁整个项目的成本、进度、质量和安全。
参考文献
[1] 李明显.浅谈水利水电工程的灌浆施工技术[J].中国高新技术企业,2014(23):144~145.
[2] 魏庆军.水利水电工程灌浆施工技术与质量管理措施分析[J].科技传播,2013(03):27~28.
[3] 谭伏龙.浅析水利水電工程基础施工灌浆技术[J].中国城市经济,2011(14):223~224.
【关键词】水利水电;基础;灌浆;技术
Discussion on grouting and foundation construction of water conservancy and hydropower project
Yang Fei
(Xinjiang Changyuan Water Group Yili Local Electric Power Co., Ltd Yining Xinjiang 835000)
【Abstract】In the construction of water conservancy and hydropower projects, the application of basic grouting technology is becoming more and more extensive, but it has strict requirements for construction management, must meet the relevant technical requirements, but also meet the basic conditions of construction. Therefore, it is of great significance to strengthen the research on grouting construction technology to improve the quality of water conservancy and hydropower project construction. This paper discusses the application of basic grouting technology in water conservancy and hydropower project with personal work experience, and provides reference for relevant workers.
【Key words】Water conservancy and hydropower;Foundation; grouting;Technology
水利水电工程是我国的重要的基础建设之一,基础建设工程是水利水电工程建设的重要组成部分,由于水利水电工程对基础工程的设置相对严格,采用灌浆施工技术能够保证水利水电工程建筑基础具有较强的抗震以及防渗性能,这对保证水利水电基础工程的质量具有至关重要的作用。
1. 水利水电工程建筑基础灌浆施工的目的和意义
(1)第一,因为建筑基础受到的水压力较大,由于渗流产生的巨大压力会使建筑基础不够牢固,且建筑基础的稳定性也会受到很大影响,要是没有正确采取防渗措施,则建筑基础的稳定性和强度都会下降,不利于安全施工。
(2)第二,在水利水电工程中,建筑基础对整个水利水电工程涞水都是十分重要的,其建筑造型、地址的选取以及施工对质量要求极高,若不能严格执行,建筑基础质量达不到要求,功能难以发挥。
(3)第三,实施水利水电工程时,要是忽视对建筑基础采取防渗措施,则建筑有可能出现塌陷,危及到下游居民的人身财产安全。
(4)第四,建筑基礎在整个水利水电工程中是至关重要的,且耗费较大。要是进行施工时,防渗工作不到位,则会影响建筑基础的质量,对经济效益造成损害,还会使资源得不到有效利用。
2. 水利水电工程建筑基础灌浆施工技术分析
2.1 普通灌浆加固技术。
一般而言,水坝基础灌浆、坝体上游区域固结灌浆、水坝体帷幕灌浆等技术都属于普通灌浆加固技术。然而下面几个问题都是在普通灌浆施工过程中必须注意的:
(1)准备阶段:做好灌浆准备,记录相关数据,将水位降低至所需的高度。
(2)清洗:清洗的工作包含清洗裂缝和清洗灌浆孔两部分内容。在还没有开始施工时,孔壁、孔底必须彻底冲洗干净,而且灌浆段要保持77%以下的稳定水压,冲洗的时长必须以孔洞的深浅以及水的清浊情况为依据进行判定。
(3)进行灌浆时,基本原理为先稀后浓,循序渐进,标准是水压力,渐渐增加浆液到一定浓度。除此之外,水灰要保持一定的配比,还可以通过添加铝粉和石英粉等调整灌浆浆液的浓度。在进行灌浆时,通过使用壁可灌浆技术提高其稳定强度,利用橡皮管的弹性的收缩压力进行自动注浆,接着提高灌浆的压力,将空气压进混凝土的毛细管当中,接着通过借助混凝土自然呼吸的作用彻底排除空气,尽可能保持畅通,提高管控质量。通过这种方式,一方面渗透效果会更好,另一方面施工时间减少,修补成本也相应降低。
2.2 化学灌浆施工技术。
化学灌浆技术是帷幕防渗透和堵漏防水的一项重要技术,在灌浆时该技术不仅能发挥加固的作用,而且还能有效的修复裂缝。现在,修建大坝、水库以及船闸等工程中都已经普遍运用了化学灌浆技术,在防渗透中发挥了有效的作用。除此之外,核电站基础加固、止水封闭也使用了这种技术,还充分运用在防堤坡和码头加固等方面。
(1)化学灌浆泵的类型。
不同的驱动方式会造成化学灌浆泵的针对面存在差异,以驱动进行划分包括电动、手动、液压以及气动泵。以灌浆方式进行划分包括双液混合泵和泵前双液混合泵两种。以不同使用地点划分为岩床化学泵和裂缝化学泵。进行施工时,稳定的压力是前提,保持可控的施工。以不同的化学灌浆泵压力划分为闭环控制式、开环、闭环L20控制、闭环比例控制四种。 (2)化学灌浆技术的优点。
在各种环境中都可以运用化学灌浆技术,且稳定无公害。其具有良好的适应性,施工成本低廉。后期的化学浆原料和施工设备都具有较高的水平,可以广泛运用于各类型的施工中。现在,我国各个施工领域基本已经认同化学灌浆技术,施工技术相对来说已经达到成熟的地步。
2.3 高压喷射灌浆防渗透技术。
相比一般的施工技术,开挖量小、工程造价不高、施工便捷等是高压喷射灌浆技术的优势。因为这种技术不需要占用太大的面积,所以对周边环境的影响不大。利用这些技术施工不但可以有效增强堤坝的防渗透能力,还能缓解洪水带来的压力。
(1)钻孔施工。
进行钻孔时,必须对漏堵进行填充,在进行施工时,同时进行套管和钻进的工作,以保持正常的孔循环。在进行钻孔时,钻孔角度必须保持垂直,且必须保持低于1%的偏斜率。在向下植入喷射管的过程中,利用泥浆固壁钻孔放置到钻孔孔洞的底部。
(2)在进行高压喷射灌浆时,若采用不同的喷射方法,则相应的基础参数也会存在差异。
无论在哪一种地质环境中,使用同一种灌浆方法,水压、浆压以及气压都会保持一致。随着底层的变化,灌浆速度也会相应的加快或放慢。通常,砂卵石地区灌浆速度会变慢,砂质环境灌浆速度会加快。而在实际灌浆的过程中,首先可以利用对先序孔的速度进行加快,再把后序孔的速度保持在较慢的水平。这样一来,如果孔中反浆量减少,则可以相应放慢加快速度。在进行施工时,灌浆速度、灌浆压力以及灌浆开进速度必须保持在一定的范围内。经过实践检验可知,通过高压喷射灌浆这种施工技术对水库的安全性可以大大提高,有利于稳定建筑基础,保持牢固的建筑基础。
2.4 无塞灌浆施工技术。
无塞灌浆施工技术同样是水利水电工程基础建筑施工中最常见的技术之一,其原理是采用自上而下灌浆的方式,这样不仅能够进行循环的灌浆,而且不需要等待凝固就能够节能型下一道工序的施工,因此该项灌浆技术被广泛的应用在现代水利水电工程基础建筑施工中。水利水电工程基础建筑施工在采用无塞灌浆施工技术时应该注意以下几个方面:
(1)钻孔施工,在进行钻孔施工的过程中,钻孔的长度应该控制在150cm~250cm之间,宽度应该控制在75mm左右,当钻孔施工结束之后,应该用水将孔内的残渣清除干净,当孔干燥之后进行灌浆施工;
(2)浆液的制备,无塞灌浆施工技术采用的浆液通常是由水、粉煤灰、水泥以及外加剂等混合制成的,在进行浆液拌合施工的过程中,应该严格的控制浆液的含水量,通常状况下,浆液的含水量控制在30%左右,当浆液制成之后还应该进行养护,以此保证浆液的保水性、可泵性以及和易性;
(3)选择注浆管,无塞灌浆施工采用的注浆管通常为无缝钢管或者钻杆,然后将内壁和注浆管之间的空隙当作回浆管,用于灌浆的循环;
(4)灌浆施工,当准备好上述所有的工序之后进行灌装施工,将回浆管插入之后进行灌浆,然后通过回浆管进行循环灌浆。
3. 如何强化水利水电工程灌浆施工管理
(1)首先,加强优质水利水电工程灌浆子系统的管理和控制。因为在水利水电灌浆施工工程中,其环节控制包括灌入水平处理以及可塑性控制,关于其控制标准则依照其工程的具体特性的不同而呈现不同状态。因此,根据预定管理标准做好浆材的科学筛选是实现控制阶段的重要依据。根据水利水电工程实施的实际情况,合理科学的做好选择,同时加强优质水利水电工程项目的灌浆管理效力,只有这样才能够对其工程建设质量提供有效的保障。而对于灌浆定理而言,其要求主要包括有劈裂定向判别、尺寸效应以及吸渗反应等等。其中尺寸效应则也就是浆材粒径尺寸必须要在被灌对象孔隙和缝洞标准宽度之下,只有这样才能够满足浆材对孔洞尺寸效应的要求。而在实施劈裂灌浆施工阶段中,载体中所具有的水力劈裂作用可以采用数值方式进行表示,同时还能够合理的判定其属性。当水头和流量的关系为平方根函数的时候,其渗流表现则也就是紊流水平,这一情况的出现也就说明裂隙出现阻塞。如果水流变化增长是在流量提升之下,则也就代表渗流断面出现扩充。吸渗作用主要是指化学浆液对低渗透介质产生侵蚀作用时,借助于浆液对载体所具有的亲和力影响和润湿作用,也就会是主体渗透方式形成该作用。
(2)其次,是不断对水利水电费用程序加强管控。对于工程项目人员来讲,必须要对不断的对其控制理念优化,以有效降低灌浆施工的投入成本为首要前提,不断的讲和具体施工相适应的施工技术引入应用在工程中,制定出最佳施工方案,依照其具体灌浆体系实施科学管控。在明确施工控制方向目标的基础上,不断完善水利水电工程费用体系的管控,进而有效增强成本控制的结果。
4. 结束语
综上所述,当前我国灌浆施工技术管理在水利水电工程建筑基础中的应用等方面的问题难度比较大,耗费时长较长,同时,外部客观原因影响较大。因而进行水利水电工程建筑基础灌浆施工技术管理的时候必须符合相关的制度规范,减少客观因素的影响。做好灌浆施工技术管理在水利水电工程建筑基础中的应用是非常必要的。不仅如此,在对水利水电工程建筑基础灌浆施工技术管理中,科学设置施工计划,对施工的过程数据进行正确的分析,提高管理的预见性,防止由于灌浆施工技术管理在水利水电工程建筑基础中的应用等问题的影响而威胁整个项目的成本、进度、质量和安全。