夏季空调耗电量在建筑总耗电量中占很大的比例,每到夏季供冷高峰期,常出现电力不足的情况。因此推广燃气直燃机组,对缓减夏季电力高峰压力起到了积极的作用。1工程概况本工程位于上海虹桥路,地下室为1层,裙房为1~3层,主楼为4~28层,为住宅楼。1层为商场,地下1层、地上2~3层为会所(包括咖啡吧、健身中心、美容美发、游泳池、棋牌室、办公室等),其中,游泳池位于3层,其下面设有设备夹层。会所建筑面积
Summer air conditioning power consumption in the total building electricity consumption accounted for a large proportion of every summer cooling peak, often appear insufficient power situation. Therefore, the promotion of gas direct-fired generating units has played a positive role in alleviating the peak electricity pressure in summer. 1 Project Overview The project is located in Hongqiao Road, Shanghai, the basement is 1 layer, podium is 1 to 3 layers, the main building is 4 to 28 layers, for residential buildings. The first floor is the shopping mall, the first floor is underground, and the second to third floors are clubs (including coffee bar, fitness center, beauty salon, swimming pool, chess room, office, etc.). The swimming pool is located on the 3rd floor. Club building area