郑州—宝鸡段电气化技术改造工程全长672.80复线公里。按照“分期建设,分段受益”的原则,郑州—三门峡西268复线公里为第一施工段,1985年10月正式动工,翌年12月31日建成通车。第二施工段由三门峡西一西安东,全长234km,1987年4月动工,翌年5月建成。1988年底又建成并开通了西安东—宝鸡东电气化铁路。至此,连同1984年通车的宝鸡—兰州电气化铁路,全长1187km的西陇海线
Zhengzhou - Baoji section of electrification technology renovation project length 672.80 double-line km. In accordance with the principle of “phased construction, benefiting in stages”, Zhengzhou-Sanmenxia West 268 double-kilometer kilometer is the first construction section and was officially started in October 1985, and was opened to traffic on December 31 of the following year. The second section of construction from west of Sanmenxia West, a total length of 234km, started in April 1987, built in May the following year. The end of 1988 and completed and opened the Xi’an East - Baoji East electrified railway. So far, along with the Baoji-Lanzhou Electrified Railway opened to traffic in 1984, a total length of 1187km West Longhai Line