模式口水电站工程已經在1956年1月18日正式破土兴工了。这座水電站建築在首都西郊石景山區模式口村外,是利用永定河引水渠道上的落差來發电的。这座水电站建設工程包括有:压力前池、進水閘(包括冲砂底孔)、压力水管、溢水堰、陡坡、消力池、变电站和机电安裝工程。永定河水自引水明渠流入前池、經过压力水管再流進廠房冲動水輪机,發电机就可以發出电來l出的电力經过昇压变电站和
Mode of hydropower project has been formally broke ground on January 18, 1956. The hydropower station construction in Shijingshan District, the western suburbs of the capital model village, is the use of the Yongding River diversion channel to generate electricity. The hydropower station construction includes: pressure before the pool, intake (including red sand bottom), pressure pipes, overflow weirs, steep slopes, stilling pool, substation and mechanical and electrical installation. Yongding water from the diversion channel into the former pool, after the pressure pipe and then into the plant impulse turbine, the generator can issue electricity to l out of the power through the step-up substation and