论文部分内容阅读
9月19日,西安至宝鸡高速铁路联调联试正式启动。9月26日,路局领导刘生荣、李桂明、张西民和西兰公司总经理晋志毅添乘高速综合检测列车检查西宝高铁联调联试工作。路局邀请了中央电视台、新华社、光明日报、陕西日报等16家中省媒体记者,登乘高速综合检测列车对西宝高铁联调联试情况进行现场体验采访,并对西宝高铁建设和调试情况进行了详细的媒体解答。联调联试期间,总工室牵头,运输、机务、电务、工务、供电、车辆等各处室协调配合,采用开行检测列车综合检测动车组的方式,自西安北经咸阳秦都站、杨陵南站、岐山站至宝鸡南,逐级提速,对轨道状
September 19, Xi’an-Baoji high-speed rail joint test was officially launched. On September 26, Liu Shengrong, Li Guiming, Zhang Ximin, the chief of the Bureau of the Roads Administration, and Jin Zhiyi, the general manager of Zealan Company, joined the high-speed integrated test train to inspect the joint project of XIBO high-speed rail. The Bureau invited 16 media reporters from Central China including CCTV, Xinhua News Agency, Guangming Daily and Shaanxi Daily to conduct an on-site interview with Xicheng High Speed Rail Joint Commissioning on boarding a high-speed integrated test train and interviewed Xibao High Speed Rail Construction and Commissioning The situation conducted a detailed media solution. During the joint commissioning test, the head office of the General Office took the lead in coordinating and coordinating with the offices of transportation, maintenance, electricity, public works, power supply and vehicles, and adopted the method of comprehensively testing the EMU for train detection. From Xi’an North via Xianyang Qindu Station, Yangling South Station, Qishan Station to Baoji South, step by step speed, on the track-like