论文部分内容阅读
在平巷掘进中,装岩是主要工序,采用装岩机装岩时,调车的快慢是出矸快慢的主要影响因素。选择合适的工作面调车或转载设施,以减少调车次数、缩短调车时间和距离,是提高装岩效率的重要途径。
In the roadway driving, rock loading is the main process, the use of rock loading rock device, the speed of shunting is the main factor affecting the speed of rock. Choosing the appropriate shunting or transfer facilities to reduce the number of shunting and shorten the shunting time and distance is an important way to improve rock efficiency.