论文部分内容阅读
本项试验的主要目的是研究和寻找为保证准格尔煤田生产用水而修建的沉沙斗槽的合理结构和运行方式。本文论述了模型设计和各项比尺的确定方法。通过对试验结果的分析找出了最合理的结构形式和运行方式
The main purpose of this test is to study and find the reasonable structure and operation mode of the sand settling tank constructed to ensure the production water in Zhungeer coalfield. This article discusses the design of the model and the determination of the various scales. Through the analysis of test results to find the most reasonable structure and operation mode