摘要:建筑工程造价管理是一项集经济、技术、组织等为一体的系统性工作,是整个建筑工程管理中不容忽视的内容。本文通过分析我国建筑工程造价管理的发展方向,研究建筑工程造价管理中存在的问题,并加强建筑工程造价管理的途径,保证工程造价管理的合理性和科学性,从而为优化资金使用,降低投资成本,合理使用人力、财力、物力,提高固定资产投资效益起到积极的作用。现就目前建筑工程造价中存在的问题结合我们的工作实践,谈谈关于建筑工程造价管理的分析探讨。
关键词:建筑管理,工程造价,问题分析,加强途径
Abstract: the construction project cost management is a collection of economy, technology, organization is a systematic work, it is the entire construction project management is not allow to neglect in content. Through analysis of construction project cost management is the direction of development, the construction project cost the problems existing in the management, and strengthen the construction project cost management way, ensure the rationality of the project cost management and scientific, thereby to optimize the use of fund and lower investment cost, reasonable use human, financial and material resources, and improve the efficiency of investment in fixed assets will exert positive role. Now is currently building project cost the problems existing in the combined with our work practice, talk about building project cost management analysis is discussed.
Keywords: building management, engineering cost, problem analysis, strengthen the way
中圖分类号:TU723.3 文献标识码:A文章编号:
1 我国建筑工程造价管理的发展方向
我国建筑工程造价管理的发展趋势有两个方面,一是工程造价管理的国际化,二是工程造价管理的信息化。工程造价管理的国际化趋势随着加入WTO 中国经济日益深刻融入全球市场,跨国公司和跨国项目越来越多,许多项目要通过国际招标、咨询或BOT 方式运作。同时,我国企业走出过国门在海外投资和经营项目也在增加。随着国内市场国际化,国内外市场全面融合,外国企业必定利用其在资本、技术、管理、人才、服务等方面的优势,挤占我国国内市场,尤其是工程总承包市场。工程造价管理国际化趋势的另一个表现在于国际间的学术交流日益频繁。
工程造价管理的信息化趋势伴随着Internet 走进千家万户,知识经济时代的供应链管理、客户关系管理、知识管理、企业资源计划管理在工程管理中形成的协同办公模式,推动了工程造价管理的信息化发展趋势。工程造价管理的信息化发展趋势给工程造价管理带来很多新的特点,工程造价管理越来越依赖于电脑手段,其竞争从某种意义上讲已成为信息战。目前西方发达国家己经在工程造价管理中运用了计算机网络技术,通过网上招投标,开始实现了工程造价管理网络化、虚拟化。另外,工程造价管理软件也开始被大量使用,同时还有专门从事工程造价管理软件开发研究工作的软件公司。种种迹象表明,工程造价管理将更多的依靠电脑技术和网络技术,未来的工程造价管理必将成为信息化管理。
2 建筑工程造价管理存在的问题
建筑工程造管理,就是运用科学技术原理和方法,在统一目标、各负其责的原则下,为确保建筑工程的经济效益和有关各方的经济权益所进行的对工程造价全过程、全方位的和符合政策及客观规律的全部业务行为和组织活动。我国建筑工程造价管理虽然取得了初步成效,但还存在不少问题。其中主要问题如下:
2.1、政府政策性影响较多是造成“三超”的重要客观环境
市场经济的特点是一般由价格机制来达到资源的优化配置,而不是政府直接决定价格、管理经济,政府职能更多地是通过宏观经济政策,引导投资、生产等经济行为。然而在经济体制的变革时期,为更快地建立起新的经济运行机制,政府政策性调整对工程投资控制影响大,特别是1992年以后随着投资体制、财税体制、金融体制、对外贸易体制改革的进行,税率、利率、汇率、价格都发生了巨大的变化,价格(包括投资品价格)变动超出了市场决定价格情况下正常变动幅度和范围,也超出了工程造价增长预留费中估计的增长幅度。
2.2、主动控制工程造价意识不强
主要表现是对建筑工程项目事前主动控制小,事后被动控制多;重竣工结算,轻施工图预算;重大中型项目设计概算,轻一般小项目设计概算,有的建设项目既不编制,也不上报审批。对施工图预算缺乏审定方案和报批程序,削弱了工程造价承上启下的作用,并直接带来施工图预算与竣工结算之间相互脱节,不仅加大工作量形成重复劳动,而且给工程造价超投资限额提供了条件。
2.3、工程造价管理的有关基础工作较薄弱
主要表现在:编制可行性研究报告投资估算,有指标还不能满足工作需要;对编制初步设计总概算时所需的概算定额和指标,各有关部门有所规定,但其来源不畅通;对民用建筑的概算指标缺少地方有关的具体规定;设备材料价格信息系统不够健全,还不能定期发表材料价格指数,以指导工程造价的预测和调整。
2.4、片面强调计价依据的市场化,忽视计价依据控制工程造价的作用
由于受计划经济体制的影响,我国的工程造价管理工作历来重视实施阶段的造价确定,不重视造价的有效控制。在这种管理方式的影响下,一方面,建设项目前期所需计价依据的缺乏,成为导致工程建设项目投资“三超”现象的一个重要原因;另一方面,由于将工程造价管理仅限于实施阶段,造成了认识上的错觉,似乎一谈起计价依据的改革就笼统地归结到所谓的企业自主定价和市场形成价格,而不从工程造价全过程管理的思路出发考虑计价依据的改革。因为只注重实施阶段计价依据的改革,片面强调计价依据的市场化,从而忽视了计价依据在建设项目前期阶段对工程造价的控制作用。
3 加强建筑工程造价管理的途径
3.1建立市场价格管理体系。我国现行的工程造价管理中实行的定额定价制度,即“量价合一”的计价方法,标底按定额编制,投标价高于或低于一定程度即为废标,其实是变相地管制了工程价格。以市场为取向的工程造价管理改革并不是反对定额中消耗标准部分,相反地,这部分是宝贵的成本资料,是政府、业主控制投资、承包商控制成本的重要依据。工程造价的确定与管理的改革目标,是建立市场经济的计价模式,这种模式就是制订全国统一的工程量计算规则,给出统一项目划分下的各项目的消耗标准,在招标时,由招标方提供工程量清单,各承包商根据自己的实力,按照竞争策略的要求自主报价,业主择优定标,以工程合同使报价合法化,施工中出现与招标文件或合同规定不符合的情况或工作量,据实索赔,调整支付,对工程建设项目实施的全过程实行有效控制、动态管理。
3.2建立科学的工程造价管理体系。国际上许多国家工程造价管理经验表明,建立科学的管理体系,实行科学管理是工程造价管理的成功所在,因此在我国的工程造价管理改革中,应逐步建立起完整的科学管理体系。建立科学管理体系应包括如下方面:建立工程造价信息库并建立多渠道的信息发布体系;大力发展工程造价管理咨询服务业;建立和完善造价工程师执业资格制度;加强计算机技术的应用。
3.3引进新理念,促进观念更新。在我国的工程施工阶段的工程造价管理工作中,往往由于业主和承包商之间作为完全对立的利益主体,在有关经济活动中矛盾突出,虽然有各种相关的计价规定、定额和管理办法等,但对文件的解释和理解难达成共识,合作关系紧张,给工程结算管理带来了许多困难。
在长期的工程实践中,人们从单纯的合约关系,发展为对双赢理念的认同。所谓双赢,即合作的双方(或多方)通过共同合作实现各自的目标,在某种意义上讲都是赢家。在建筑工程造价管理中引入双赢理念,即投资者达到预期收益,承包商获得合理的期望利润。达到双赢,对投资者和承包商都提出了较高的要求。要实现双赢,投资者与承包人不单纯是买方和卖方的关系,在某种意义上说也具有了共同获利的合作关系。
4 结语
建筑工程造价在我国长久存在概算超估算、预算超概算、决算超预算的现象,严重困扰着建筑工程投资效益管理。人们开始重新认识有关工程造价管理问题,对建筑工程造价管理进行跟进分析,进一步提高建设项目的投资效益,降低工程成本,更好地适应我国市场经济体制的需要,并与国际建筑市场接轨具有重大的意义。
参考文献:
[1]潘文军; 工程造价的全过程管理与控制 [N];建筑时报; 2006年
[2]戴莉莉,王国英; 我国建设工程造价存在的问题及其改革措施 [J];今日科苑; 2006年06期; 93
[3]赖红雨,蔡斌; 建设工程造价管理所遇问题以及对策探讨 [J];广东科技; 2006年10期; 137-138
注:文章内所有公式及图表请用PDF形式查看。
关键词:建筑管理,工程造价,问题分析,加强途径
Abstract: the construction project cost management is a collection of economy, technology, organization is a systematic work, it is the entire construction project management is not allow to neglect in content. Through analysis of construction project cost management is the direction of development, the construction project cost the problems existing in the management, and strengthen the construction project cost management way, ensure the rationality of the project cost management and scientific, thereby to optimize the use of fund and lower investment cost, reasonable use human, financial and material resources, and improve the efficiency of investment in fixed assets will exert positive role. Now is currently building project cost the problems existing in the combined with our work practice, talk about building project cost management analysis is discussed.
Keywords: building management, engineering cost, problem analysis, strengthen the way
中圖分类号:TU723.3 文献标识码:A文章编号:
1 我国建筑工程造价管理的发展方向
我国建筑工程造价管理的发展趋势有两个方面,一是工程造价管理的国际化,二是工程造价管理的信息化。工程造价管理的国际化趋势随着加入WTO 中国经济日益深刻融入全球市场,跨国公司和跨国项目越来越多,许多项目要通过国际招标、咨询或BOT 方式运作。同时,我国企业走出过国门在海外投资和经营项目也在增加。随着国内市场国际化,国内外市场全面融合,外国企业必定利用其在资本、技术、管理、人才、服务等方面的优势,挤占我国国内市场,尤其是工程总承包市场。工程造价管理国际化趋势的另一个表现在于国际间的学术交流日益频繁。
工程造价管理的信息化趋势伴随着Internet 走进千家万户,知识经济时代的供应链管理、客户关系管理、知识管理、企业资源计划管理在工程管理中形成的协同办公模式,推动了工程造价管理的信息化发展趋势。工程造价管理的信息化发展趋势给工程造价管理带来很多新的特点,工程造价管理越来越依赖于电脑手段,其竞争从某种意义上讲已成为信息战。目前西方发达国家己经在工程造价管理中运用了计算机网络技术,通过网上招投标,开始实现了工程造价管理网络化、虚拟化。另外,工程造价管理软件也开始被大量使用,同时还有专门从事工程造价管理软件开发研究工作的软件公司。种种迹象表明,工程造价管理将更多的依靠电脑技术和网络技术,未来的工程造价管理必将成为信息化管理。
2 建筑工程造价管理存在的问题
建筑工程造管理,就是运用科学技术原理和方法,在统一目标、各负其责的原则下,为确保建筑工程的经济效益和有关各方的经济权益所进行的对工程造价全过程、全方位的和符合政策及客观规律的全部业务行为和组织活动。我国建筑工程造价管理虽然取得了初步成效,但还存在不少问题。其中主要问题如下:
2.1、政府政策性影响较多是造成“三超”的重要客观环境
市场经济的特点是一般由价格机制来达到资源的优化配置,而不是政府直接决定价格、管理经济,政府职能更多地是通过宏观经济政策,引导投资、生产等经济行为。然而在经济体制的变革时期,为更快地建立起新的经济运行机制,政府政策性调整对工程投资控制影响大,特别是1992年以后随着投资体制、财税体制、金融体制、对外贸易体制改革的进行,税率、利率、汇率、价格都发生了巨大的变化,价格(包括投资品价格)变动超出了市场决定价格情况下正常变动幅度和范围,也超出了工程造价增长预留费中估计的增长幅度。
2.2、主动控制工程造价意识不强
主要表现是对建筑工程项目事前主动控制小,事后被动控制多;重竣工结算,轻施工图预算;重大中型项目设计概算,轻一般小项目设计概算,有的建设项目既不编制,也不上报审批。对施工图预算缺乏审定方案和报批程序,削弱了工程造价承上启下的作用,并直接带来施工图预算与竣工结算之间相互脱节,不仅加大工作量形成重复劳动,而且给工程造价超投资限额提供了条件。
2.3、工程造价管理的有关基础工作较薄弱
主要表现在:编制可行性研究报告投资估算,有指标还不能满足工作需要;对编制初步设计总概算时所需的概算定额和指标,各有关部门有所规定,但其来源不畅通;对民用建筑的概算指标缺少地方有关的具体规定;设备材料价格信息系统不够健全,还不能定期发表材料价格指数,以指导工程造价的预测和调整。
2.4、片面强调计价依据的市场化,忽视计价依据控制工程造价的作用
由于受计划经济体制的影响,我国的工程造价管理工作历来重视实施阶段的造价确定,不重视造价的有效控制。在这种管理方式的影响下,一方面,建设项目前期所需计价依据的缺乏,成为导致工程建设项目投资“三超”现象的一个重要原因;另一方面,由于将工程造价管理仅限于实施阶段,造成了认识上的错觉,似乎一谈起计价依据的改革就笼统地归结到所谓的企业自主定价和市场形成价格,而不从工程造价全过程管理的思路出发考虑计价依据的改革。因为只注重实施阶段计价依据的改革,片面强调计价依据的市场化,从而忽视了计价依据在建设项目前期阶段对工程造价的控制作用。
3 加强建筑工程造价管理的途径
3.1建立市场价格管理体系。我国现行的工程造价管理中实行的定额定价制度,即“量价合一”的计价方法,标底按定额编制,投标价高于或低于一定程度即为废标,其实是变相地管制了工程价格。以市场为取向的工程造价管理改革并不是反对定额中消耗标准部分,相反地,这部分是宝贵的成本资料,是政府、业主控制投资、承包商控制成本的重要依据。工程造价的确定与管理的改革目标,是建立市场经济的计价模式,这种模式就是制订全国统一的工程量计算规则,给出统一项目划分下的各项目的消耗标准,在招标时,由招标方提供工程量清单,各承包商根据自己的实力,按照竞争策略的要求自主报价,业主择优定标,以工程合同使报价合法化,施工中出现与招标文件或合同规定不符合的情况或工作量,据实索赔,调整支付,对工程建设项目实施的全过程实行有效控制、动态管理。
3.2建立科学的工程造价管理体系。国际上许多国家工程造价管理经验表明,建立科学的管理体系,实行科学管理是工程造价管理的成功所在,因此在我国的工程造价管理改革中,应逐步建立起完整的科学管理体系。建立科学管理体系应包括如下方面:建立工程造价信息库并建立多渠道的信息发布体系;大力发展工程造价管理咨询服务业;建立和完善造价工程师执业资格制度;加强计算机技术的应用。
3.3引进新理念,促进观念更新。在我国的工程施工阶段的工程造价管理工作中,往往由于业主和承包商之间作为完全对立的利益主体,在有关经济活动中矛盾突出,虽然有各种相关的计价规定、定额和管理办法等,但对文件的解释和理解难达成共识,合作关系紧张,给工程结算管理带来了许多困难。
在长期的工程实践中,人们从单纯的合约关系,发展为对双赢理念的认同。所谓双赢,即合作的双方(或多方)通过共同合作实现各自的目标,在某种意义上讲都是赢家。在建筑工程造价管理中引入双赢理念,即投资者达到预期收益,承包商获得合理的期望利润。达到双赢,对投资者和承包商都提出了较高的要求。要实现双赢,投资者与承包人不单纯是买方和卖方的关系,在某种意义上说也具有了共同获利的合作关系。
4 结语
建筑工程造价在我国长久存在概算超估算、预算超概算、决算超预算的现象,严重困扰着建筑工程投资效益管理。人们开始重新认识有关工程造价管理问题,对建筑工程造价管理进行跟进分析,进一步提高建设项目的投资效益,降低工程成本,更好地适应我国市场经济体制的需要,并与国际建筑市场接轨具有重大的意义。