小浪底水库工程

来源 :人民黄河 | 被引量 : 0次 | 上传用户:yizeswing
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
拟建的黄河小浪底水库工程,处于黄河最后一个峡谷的下段,在河南省孟津县境内,是三门峡以下(距三门峡130公里)一座综合利用水利枢纽。土石坝坝高151米、总库容127亿立米,回水到三门峡,装机180万瓩,枢纽最大泄量15000秒立米。一、小浪底水库的开发任务是防洪、减淤、供水、发电和防凌。它的建成将对黄河下游的安全和工农业的发展起很大作用。 The proposed Xiaolangdi Reservoir Project, located in the lower reaches of the last canyon of the Yellow River, is a comprehensive utilization of water conservancy hub below Sanmenxia (130 km away from Sanmenxia) in Mengjin County of Henan Province. Earth dam rock 151 meters high, with a total storage capacity of 12.7 billion cubic meters, back to Sanmenxia, ​​installed 1.8 million 瓩, hub maximum discharge of 15,000 seconds of legislation. First, Xiaolangdi reservoir development tasks are flood control, sedimentation, water supply, power generation and anti-Ling. Its completion will play a significant role in the safety of the lower Yellow River and the development of industry and agriculture.
其他文献
目的:研究小儿过敏性紫癜结肠粘膜病理改变、临床意义及其治疗措施。方法:采用纤维结肠镜对临床确诊为过敏性紫癜患儿结肠腔内病变形态进行观察及处理。结果:过敏性紫癜患儿共92例
婴儿期低钙惊厥原因较多。现报告3例由甲状旁腺功能低下所导致的惊厥。1 病例报告例1:男,3月。因间歇性抽搐12天入院。发作时意识丧失,眼球上翻,手足阵阵抽动,每次时间为数
江西省水库表层取水技术经验交流会于1982年10月19日~24日在南昌召开。参加这次会议的有水电部情报所、武汉水电学院、中国农民报编辑部、吉林省水利科研所、贵州省水利设计
学生的职业能力只有经历参与特定的职业活动情境,通过对已有的知识、技能、态度等的类化迁移并加以整合,才能完善和发展。因此,中职数控技术应用专业学生在学习数控机床加工
作为政府经济和社会日常管理的重要组成部分,事业单位的财务管理尤为重要,在我国施行的经济体制改革中,引导部分行业不同性质的事业单位施行企业化财务管理,将是财务会计改革
七八年十二月水电部颁发的《电力建设施工及验收技术规范》(水轮发电机组篇)是机电安装工作的指导性文件,是衡量机电安装工程质量的准绳。随着机组容量的增大,发电电压的提
The fungicide resistance of anthracnose in Camellia oleifera nurseries was investigated in Liuyang,Changning,and other regions in Hunan Province.The Colletotric
目的:为探讨兴奋性氨基酸(EAA)在新生儿缺氧缺血性脑病(HIE)中的作用。方法:应用反相高效液相色谱法检测39例HIE患儿治疗前后脑脊液(CSF)中14种游离氨基酸含量,并与无神经系统疾病的新生儿作对照。结果
我们自1994年10月至1996年2月,对采用酶联免疫吸附试验检验大便中轮状病毒抗原阳性者68例,临床观察合并心肌损害情况,现报告如下。 临床资料选择68例酶联免疫吸附试验大便阳