论文部分内容阅读
我社位于玛纳斯河西岸,与农八师二十三团相邻。地势开阔,南高北低,为玛纳斯河山前冲积洪积平原,纵坡约1/100。地下水位南部50多米,北部2—3米,土壤肥沃,结构良好。 灌溉水源依靠玛纳斯河供给,其分水比例,我社枯水期(4—6月底和9—11月底)占6%,洪水期(7—8月底)3.9%,全年引进毛水量4,000—6,000万方。 一九五七年,我们开始学习兵团经验,平整土地,改进灌溉方法。一九五八年进行土地规划,到一九六四年上半年,共完成条田规划10,251亩,开挖渠道57条(总长74,800米),修建闸门48座、桥梁8座、渡槽7座、跌水14座和较大型的水工建筑物14座,为实行计划用水、正
Our company is located in the west bank of the Manas River, adjacent to the 23rd Agricultural Group. Open terrain, high in the south and low in the north, is the alluvial plain of the Manas River foredeep alluvial plains, longitudinal slope of about 1/100. Groundwater level of more than 50 meters south, 2-3 meters in the north, fertile soil, good structure. Irrigation sources rely on the supply of the Manas River. The water diversion ratio is 6% during the dry season (the end of April-June and the end of September-November) and 3.9% of the flood season (from the end of July to the end of August). The annual introduction of 4,000- 60 million square. In 1957, we began to learn Corps experience, leveling the land and improving irrigation methods. In 1958, land planning was carried out. By the first half of 1964, a total of 10,251 mu of strip fields were planned, 57 excavation channels (total length of 74,800 meters), 48 gates built, 8 bridges, 7 aqueducts, 14 and larger hydraulic structures 14, to plan the implementation of water, is