论文部分内容阅读
随着经济的发展和城镇化进程的加快,人们迫切需要从钢筋混凝土的环境中寻找重返自然的乐趣。各地大兴园林绿地建设,纵观建成的园林工程,景观效果却并不理想。究其原因,在园林施工过程中图纸变更较多,而工程变更却缺乏正常的变更手续和专业人员的介入,导致建成的园林景观效果不太理想。基于此,通过对施工的全过程跟踪研究,理论联系实际提出相应的对策,以期达到最好的景观效果,为居民创造更舒适的生活环境。
With the development of economy and the acceleration of urbanization, people urgently need to look for the pleasure of returning to nature from the environment of reinforced concrete. Daxing around the construction of green space around the built landscape project, the landscape effect is not ideal. The reason for this is that many changes have been made in the drawings during the construction of the gardens. However, the changes of the works lacked the normal procedures for changes and the intervention of professionals, resulting in unsatisfactory results of the completed landscape. Based on this, through tracking research on the whole process of construction, the corresponding countermeasures are put forward in the light of theory in order to achieve the best landscape effect and create a more comfortable living environment for residents.