现浇钢筋混凝土楼梯及踏步的模板,以往多采用木模。但木模的周转率低,拆除损耗大,既费工又费料,很不经济。我单位在新疆地矿局知青饭店工地现浇钢筋混凝土楼梯施工中,踏步的模板采用定型钢模,组装了一套简易模板,效果很好。它的优点是方法简单,操作方便,节约木材,减轻劳动强度,提高工效1倍。组装方法:用2根φ50钢管,长度略大于一跑楼梯,在两根钢管上分别按踏步水平宽度焊(?) 50×5角钢,并在角钢上钻2φ12圆孔,中距为150毫米,与钢模板两孔距相
Cast-in-situ reinforced concrete staircases and stepping stencils were used in the past. However, the turnover rate of wood molds is low, and the demolition loss is large, which is both laborious and wasteful, and it is not economical. In the construction of the cast-in-situ concrete reinforced concrete stairs at the site of the E-Qing Hotel in the Xinjiang Geological and Mineral Bureau, the unit used a fixed-form steel mold and assembled a set of simple templates. The results were very good. Its advantages are simple method, convenient operation, saving wood, reducing labor intensity and improving work efficiency by 1 time. Assembly method: Use 2 φ50 steel tubes, the length is slightly larger than a running staircase, and weld (?) 50×5 angle steels on each of two steel tubes by horizontal step width, and drill 2φ12 round holes on the angle steel with a distance of 150 mm. Two-pitch phase with steel template