论文部分内容阅读
龙烟铁矿选矿厂原设计规模为年处理原矿58万吨,磨选工艺流程较简单。选厂投产以来,生产过程中的产品质量检验,一直沿用“死后验尸”方法。选矿过程中各环节的输入、输出及可控因素常常处于不稳定状态,出了废品不能及时发现,因而不能预防废品的发生。众所周知,任何产品的质量波动都是不可避免的,但是这个波动应该有一个适当的范围,并符合一定的规律。产品质量的好坏,取决于生产过程中的
Longyan iron ore beneficiation plant designed to deal with the original scale of 580,000 tons of ore, milling process is relatively simple. Since the plant was put into operation, product quality inspection in the production process has been followed “post mortem” method. During the dressing process, the input, output and controllable factors are often in an unstable state. If the waste product can not be found in time, the waste product can not be prevented. As we all know, any product quality fluctuations are inevitable, but the fluctuations should have a suitable range, and in accordance with certain laws. The quality of the product depends on the production process