劳动定额管理体制改革设想

来源 :中国劳动科学 | 被引量 : 0次 | 上传用户:sgzhou22
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1、建立独立的有权威的定额专管机构。 多年来,企业劳动定额管理机构设置的变化,只是在归属问题上做文章,没有形成独立的专管机构,它对于有计划的商品经济体制已经不能适应。因为新的经济体制是以提高经济效益为中心的,生产以销售为导向,因此要求劳动定额管理的功能要齐全,要成为企业系统的一个子系统,成为与劳动管理、工艺管理、生产管理等诸系统并驾齐驱的管理机构。这个机构可以称为劳动效率科或工效管理科,它既是全厂 1. Establish an independent and authoritative quota agency. Over the years, the changes in the establishment of corporate labor quota management institutions have only made a fuss about the issue of attribution and have not formed an independent specialized agency. It can no longer adapt to a planned commodity economic system. Because the new economic system is centered on improving economic efficiency and production is guided by sales, the function of labor quota management must be complete, and it must become a subsystem of the enterprise system, and become a labor management, process management, production management, etc. Systems that run parallel to systems. This institution can be called the Labor Efficiency Section or the Ergonomics Management Section. It is a whole plant.
其他文献
由能源部农村能源及电气化司和农业部环保能源司共同组织的1990年全国太阳能热水器质量评比,经过几个月的技术测试,评委会评审和全体参评的厂家的大会评比,于10月25日降下帷
《机械设备安装工程施工及验收规范》,系我国工程建设重要的技术法规之一。它是,为适应我国工程建设需要、以恢复机械设备制造的性能和检验机械设备安装施工的质量好坏为目
美丽的印度洋岛国——斯里兰卡首都科伦坡市中心有一块名叫赫尔夫特斯道普的高地,高地上矗立着一座该城最高,建筑新颖、独特、壮观的巨大建筑物,这就是我国政府向斯里兰卡提
石龙坝发电厂,我国第一座水力发电厂,到今年已经开工建设80年了,这座在昆明西面的小水电厂,在全世界也算建设较早的水电厂。记得建国初期一位波兰专家到昆明,一下飞机就提出
滂沱的雨舒缓了她的喷淋力度,这激越的田园交响曲渐人尾声。站在窗边,东方有几朵白云轻盈地走过,察见她的妩媚多姿,不由得怦然心动,我要出发,去追云逐雨,去访柳问荷,去乡村信
为了解决石棉的公害问题,日本新日铁化学公司最近宜布,已找到了将石棉改造成为无害材料的方法。石棉的最大威胁是来自于它那针状的纤维结构。这种结构使它们能吸附在人体呼
英国LK工具公司是一家生产精密测量机的厂商,拥有200名职工。在1986年,该公司产品销售额达到4400万英磅。产品出口比率达75%。该公司制造的测量机主要特点是用花岗岩来制造
我国的建筑业,经过40年的发展,目前已基本具备了作为国民经济支柱产业的主要条件。 一、建筑业产值迅速增长,已成为国民经济中的重要产业部门。建国40年来,建筑业共创造总产
厦门佳宝房产有限公司,是1984年10月经原厦门经济特区管委会批准成立的,注册资本一千万元人民币,是厦门经营房产业的首批中外合资企业。但由于没有按市场经济规律办事等原因
西欧铁路网密度很高,铁路运输业相当发达。其中,德国西部每百平方公里拥有铁路11.3公里。法国为6.4公里,英国为6.9公里,意大利为5.3公里,荷兰为7公里,比利时为12.5公里。80