1991年前后,我们受保定市劳动部门的委托,开始对全市范围内的锅炉水处理情况进行调查。调查中有这样两个典型例子引起了我们的思考:一个是定兴县某单位的热水锅炉清洗工人进行清垢时,一次竟能掏出几十公斤铁垢,有的管子强度已经很差,主要问题是停炉后没有人管。一个夏季风吹雨淋已是面目全非。第二个例子是涿州市造纸厂一台4t/h蒸汽炉是1974年安装的,每年停炉以后该厂都立即采取保护措施(灌水、加药),结果此炉运行二十多年除传动部门外受压部件未发生过大的故障。1994年更换了全部烟管,预计此炉还能正常使用十年以上。因此,停用锅炉的保护问题不可小看。
Before and after 1991, we were commissioned by the labor department of Baoding City to start an investigation into the boiler water treatment in the city. There are two typical examples of the survey aroused our thinking: one is Dingxing County, a unit of hot water boiler cleaning workers to carry out cleaning, once actually pulled out dozens of kilograms of iron scale, and some pipe strength has been poor The main problem is that nobody has any control after the shutdown. A summer monsoon has been beyond recognition. The second example is that a 4t / h steam boiler at Danzhou Paper Mill was installed in 1974. The plant immediately took protective measures (irrigation and dosing) every year after shutdown. As a result, the furnace was operated for more than 20 years except for transmission Outside the Department of pressure parts did not occur too big fault. In 1994, all the smoke pipes were replaced, and it is estimated that the furnace can be normally used for more than ten years. Therefore, the protection of the disabled boiler can not be underestimated.