论文部分内容阅读
在编制开采计划时,人们总在技术方面的成木核算上下功夫,采用更大型的设备;改用大规模的采矿方法等等。可是,编制开采计划的方法始终没变。如果要优化开采,那末,采用现代计算机技术来编制计划将有很大的潜力。LKAB公司己经开始投资构造一个在信息上和逻辑上都很坚实的综合计划系统。一个好的计划系统是开采过程最优控制的基础。MAMBA是一个完整的计算机开采计划系统,该系统将被用于基律纳矿。它包含的计划内容有:从钴探计划到生产计划,并跟踪各机台的作业直到溜井后的矿石运输。MAMBA系统的基本思想是:为一切采矿用户生成并维护一个公共数据库。
At the time of drawing up the mining plan, people always worked hard on technical accounting for wood, using larger equipment, switching to large-scale mining methods and so on. However, the method of preparing a mining plan has not changed. If mining is to be optimized, there will be great potential for using modern computer technology to plan. LKAB has started investing in a comprehensive information system that is logically strong and comprehensive. A good planning system is the basis for optimal control of the mining process. MAMBA is a complete computer mining planning system to be used at Kiruna Mine. It includes the planning of the project from Cobalt exploration planning to production and tracking of the operation of the machine until after the ore transport wells. The basic idea behind MAMBA is to generate and maintain a public database for all mining users.