论文部分内容阅读
论述了我公司二期双甲项目采用的3种设计先进、高效节能的屏蔽电泵,并分析了屏蔽电泵在二期运行过程中出现的问题及应该注意事项。
Three types of advanced and highly efficient energy-saving shielded electric pumps used in the second phase of Double-A project of our company are discussed. The problems and their precautions during the second phase of the operation of shielded electric pumps are analyzed.