新疆水电安装公司努力贯彻立足水电、面向社会的方针,在积极投入托海水电站(4×12500千瓦)和大山口(4×20000千瓦)电站机电安装及金属结构制作安装工程和订货工作的同时,86年又承包了新疆石油管理局一座2×31500~(KVA) ,110 /35/6.3~(kv)变电所工程。该工程贯彻改革基建管理体制的精神,采用设计、订货、土建、安装一条龙按概算总包的方式。竣工
Xinjiang Hydropower Installation Co., Ltd. is striving to implement a hydropower-oriented and social-oriented approach. While actively investing in the electromechanical installation and metal structure production installation and ordering work for the Tokai Hydropower Station (4×12,500 kW) and Dashankou (4×20000 kW) power stations, In 1986, it contracted a 2×31500 KVA, 110/35/6.3-kV substation project of the Xinjiang Petroleum Administration. The project implements the spirit of reforming the infrastructure management system and uses design, ordering, civil engineering, and installation methods to estimate the total package. Completion