论文部分内容阅读
国家奥林匹克体育中心游泳馆工程以其新颖独特的斜拉索网架屋盖结构形式,“眉清目秀的场容”和“一流”的质量享誉国内,但你可曾知道,该工程还以获得三个国家级优秀 QC 成果和五个高级优秀成果的优异成绩创下了全国同行业单位工程优秀 QC 成果之冠。承建游泳馆的北京市第三建筑工程公司是国家质量管理奖获得者。在该馆的整个施工过程中,他们以方针目标管理为主导,全面质量管理为中心,在“全”字上下功夫,大力开展 QC 小组活动、保证了游泳馆高速、优质如期完工,获得了良好的工程效益、技术效益、经济效益和社会效益,谱写了一曲全面质量管理的凯歌。
The National Olympic Sports Center Natatorium Project is known for its novel and unique cable-stayed roof structure, “brilliant appearance” and “first-class” quality, but you knew that the project also acquired three The excellent results of the national-level excellent QC results and the five high-level outstanding achievements have achieved the highest number of outstanding QC results for the same industry unit projects across the country. The Beijing No. 3 Construction Engineering Company, which has built a swimming pool, is the winner of the National Quality Management Award. During the entire construction process of the museum, they took policy-oriented management as their guide, and focused on total quality management. They worked hard on the word “whole” and vigorously carried out QC group activities to ensure that the swimming pool was completed at high speed and high quality. The engineering benefits, technical benefits, economic benefits, and social benefits, and compose a song of total quality management.