论文部分内容阅读
在道路桥梁施工的过程当中,对于软土地基的处理方式有很多种,施工方需要结合施工场地的具体情况以及施工的工期、施工环境等因素进行科学合理的分析,选择最为合适的处理方式。施工单位应该按照相关要求对工程进行施工,对于软土地基进行处理的过程当中应该选择合理的施工方式,采用最合理有效的加固措施进行施工。同时相关的技术与质量检查部门还需要对整个工程的施工情况进行相关的检查与管理。目前经常使用的施工方式主要包括置换、加筋、密实施工技术,在施工的过程当中需要根据具体的情况进行合理的选择,并且严格按照施工流程进行施工,加强对桩基和灌浆施工质量的控制。
In the process of road and bridge construction, there are many kinds of ways to deal with the soft soil foundation. The construction party needs to make scientific and reasonable analysis according to the specific conditions of the construction site, the construction period, construction environment and other factors, and select the most appropriate approach. The construction unit should construct the project in accordance with relevant requirements. For the process of soft soil foundation construction, reasonable construction methods should be selected and the most reasonable and effective reinforcement measures should be adopted for construction. At the same time the relevant technical and quality inspection departments also need to conduct the construction of the entire project related inspection and management. At present, the frequently used construction methods mainly include replacement, reinforcement and dense construction techniques. During the construction process, it is necessary to make reasonable choices according to specific conditions and strictly follow the construction process to strengthen the control over the quality of pile foundation and grouting construction .