论文部分内容阅读
本文针对石头河水库西安供水工程施工特点,以砼抗压强度和砼原材料费用为目标值,用系统分析的多目标规划法,求出各种材料的最优用量,以达到对砼质量的适时控制。
In this paper, aiming at the construction characteristics of the Xi’an water supply project of Shitouhe Reservoir, taking the compressive strength of thorium and the raw material cost of ramming as the target value, we use the multi-objective planning method of systematic analysis to find the optimal amount of various materials so as to achieve the right quality of the thorium. control.