Joint sub-optimization of cooperative relays in Multiple-Input and Multiple-Output (MIMO) multiple relays aided communication system is discussed in this paper. Because the instantaneous channel state information of all source-relay channels and all relay-user channels is difficult to get at each relay node, an unjoined solution is designed according to the channel state information of that relay only. Then a multi-user loading algorithm is proposed to utilize the space diversity through multi-relay transmission. The simulation results show that with the newly proposed multi-user loading algorithm, the unjoined solution can achieve better system performance comparing with joint one in low SNR. However, the complexity of the former is much lower, for only partial CSI is needed. Joint sub-optimization of cooperative relays in Multiple-Input and Multiple-Output (MIMO) multiple relays aided communication system is discussed in this paper. Since the instantaneous channel state information of all source-relay channels and all relay-user channels is difficult to get at each relay node, an unjoined solution is designed according to the channel state information of that relay only. Then a multi-user loading algorithm is proposed to utilize the space diversity through multi-relay transmission. The simulation results show that with the newly proposed multi-user loading algorithm, the unjoined solution can achieve better system performance comparing with joint one in low SNR. However, the complexity of the former is much lower, for only partial CSI is needed.
其他文献
龙河口水库东大坝上部坝体为黏土心墙,下部坝基为砂卵石透水层。为适应坝体变形,上部黏土心墙内采用塑性混凝土防渗墙;为提高承载能力和抗渗耐久性,下部砂卵石层内采用刚性混凝土
哈达山水利枢纽工程为吉林省重点水利工程之一,国家50亿kg商品粮生产基地重要水源供应之一,工程于2007年末开工建设。本文对该工程的施工导流进行充分的论述,为工程的顺利开工起
设计了GF(q)上一类新型的广义自缩生成器。GF(q)上的广义自缩序列族B(a)具有群结构和线性结构,这些序列之间具有良好的互相关性和均衡性。当n≥2时,族B(a)中不少于(q-1)/q的
广西桥巩水电站泄水闸工作闸门为超大型露顶式平面滚轮钢闸门,闸门尺寸15.0m×24.9m,由固定式卷扬启闭机启闭,闸门常在局部开启条件下运行,闸门下游强紊动水流与闸门之间复杂的耦
会议
宝泉抽水蓄能电站上水库主坝于2007年7月完成了主坝全部整平胶结层施工,2007年7月28日~30日,工地遭遇特大暴雨,整平胶结层出现沥青混凝土沉降、塌陷、裂缝。根据工程损毁现状,进行
巴山水电站工程由于地形、地质条件复杂,采用了折线型面板坝布置。对折线面板坝进行三维计算,研究了其应力变形特性,并重点研究折线处面板连接方式,指导设计。
小浪底工程F1断层位于大坝混凝土防渗墙右侧,顺河向展布,为坝基处理的关键部位。采用灌浆、混凝土盖板和水平反滤保护等综合处理措施。混凝土盖板在施工中和工程蓄水运用后,均产
会议
水布垭面板堆石坝施工中的土石方挖运填总量超过5000万m3,土石方调配是工程施工中的关键问题。科学合理的土石方调配方案对于确保工程进度、质量、成本以及坝区环境目标的实现
会议
结合尼尔基水利枢纽主坝沥青混凝土防渗心墙导流明渠段工程施工实际,对浇筑式沥青混凝土施工新技术进行了研究与应用,提出了复合心墙浇筑式沥青混凝土与低沥青含量振捣式沥青混
巴贡电站水利枢纽工程混凝土面板堆石坝2004年6月15日开始坝体填筑,面板与填筑料之间采用了挤压边墙施工技术,简化了施工工序,加快了施工进度,提高了施工安全和施工质量,降低了施