论文部分内容阅读
本次水文地质、工程地质、环境地质勘查工作,在搜集利用区域水文地质资料和周边已有矿区水文地质、工程地质、环境地质资料的基础上,根据《矿区水文地质工程地质勘探规范》GB12719-91的有关规定,结合查干哈达庙矿区的实际情况,开展了相应的工作。其目的是查明矿区含水层及隔水层的岩性、厚度、产状、分布范围、埋藏条件、水位、水质、水量、水温,矿层顶底板岩石的稳定性,矿区地下水的补给、径流、排泄条件及各含水层之间的水力联系,以确定矿床充水因素,预测矿坑涌水量,对矿床水资源综合利用进行分析,指出供水水源方向,评价地质环境。
This hydrogeology, engineering geology, environmental geology exploration work, on the basis of collecting and using the regional hydrogeological data and hydrogeology, engineering geology and environmental geology data of the existing mining areas, according to “Geological Prospecting Specifications of Mining Area Hydrogeology and Engineering” GB12719- 91 relevant provisions, combined with Chagan Hada Temple mining area of the actual situation, carried out the corresponding work. The purpose is to ascertain the lithology, thickness, occurrence, distribution range, burial conditions, water level, water quality, water quantity, water temperature, rock stability of the top and bottom of the ore floor, groundwater recharge, runoff, Drainage conditions and the hydraulic connection between the aquifers to determine the factors that affect the filling of the deposit, predict the amount of water in the pit, analyze the comprehensive utilization of water resources in the deposit, point out the direction of water supply and evaluate the geological environment.