江苏永钢集团有限公司炼铁三厂8号布袋除尘高炉煤气每天产出量分厂抄表为550多万m3,能源管理系统的数据为680多万m3,同一个点,分厂累加程序与能源管理系统的累加程序是一样的,不同之处是分厂的累加程序没有清零,能源管理系统的累加程序清零值为1 000万m3,误差在23.6%左右。为了解决此类问题,作者设计了一套流量累计系统,不但解决了炼铁三厂高炉煤气累计误差问题,而且此系统应用到全厂各个介质的流量计算中,各个介质的供消平衡有了很大改善。
Jiangsu Yonggang Group Co., Ltd. Iron Ore No.8 bag dusting Blast furnace gas output per day for more than 5.5 million m3 meter reading, energy management system data for more than 680 million m3, the same point, branch accumulation procedures and The accumulation procedure of the energy management system is the same except that the accumulation procedure of the plant is not cleared. The accumulated value of the energy management system is set at 10 million m3 with an error of 23.6%. In order to solve such problems, the author designed a set of flow totalization system, which not only solved the cumulative error of blast furnace gas in the third ironmaking plant, but also applied the flow calculation of each medium in the whole plant. Great improvement.