ANALYSIS AND IMPROVEMENT OF LEAD TIME FOR JOB SHOP UNDER MIXED PRODUCTION SYSTEM

来源 :Chinese Journal of Mechanical Engineering | 被引量 : 0次 | 上传用户:wangcaihong121
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Firstly an overview of the potential impact on work-in-process (WIP) and lead time is provided when transfer lot sizes are undifferentiated from processing lot sizes. Simple performance examples are compared to those from a shop with one-piece transfer lots. Next, a mathematical programming model for minimizing lead time in the mixed-model job shop is presented, in which one-piece transfer lots are used. Key factors affecting lead time are found by analyzing the sum of the longest setup time of individual items among the shared processes (SLST) and the longest processing time of individual items among processes (LPT). And lead time can be minimized by cutting down the SLST and LPT. Reduction of the SLST is described as a traveling salesman problem (TSP), and the minimum of the SLST is solved through job shop scheduling. Removing the bottleneck and leveling the production line optimize the LPT. If the number of items produced is small, the routings are relatively short, and items and facilities are changed infrequently, the optimal schedule will remain valid. Finally a brief example serves to illustrate the method. Pre-an overview of the potential impact on work-in-process (WIP) and lead time is provided when transfer lot sizes are undifferentiated from processing lot sizes. Next , a mathematical programming model for minimizing lead time in the mixed-model job shop is presented, in which one-piece transfer lots are used. Key factors affecting lead time are found by analyzing the sum of the longest setup time of individual items among the (SLST) and the longest processing time of individual items among processes (LPT). And lead time can be minimized by cutting down the SLST and LPT. Reduction of the SLST is described as a traveling salesman problem (TSP), and the Removing the bottleneck and leveling the production line optimize the LPT. If the number of items produced is small, the routings are relatively short, and items and fa cilities are changed infrequently, the optimal schedule will remain valid. Finally a brief example serves to illustrate the method.
其他文献
小绿叶蝉是茶园主要害虫,为害严重时,不仅影响茶叶品质与产量,且重施农药会导致茶园生态恶化。本文主要研究探讨小绿叶蝉为害程度对茶叶品质的影响,并结合小绿叶蝉的无公害防
茄子(Solanum melongena L.)起源于印度及东南亚热带地区,在4-5世纪传入我国,自花授粉作物,原在热带和亚热带为多年生灌木,生产上主要为一年生草本植物。我国栽培茄子历史悠
函授教育起源于英国工业革命时期,其是指通过印刷教材及通信指导等方式进行教学.目前我国普通高校成人高等教育仍然以函授教育为主,而在实际教学过程中,高校、函授站、面授教
Uveal melanoma is the most common primary intraocular malignancy in adults.And there is an absence of targeted agents for patients with uveal melanoma.Pyrvinium
在全面推进教育改革的基础上对教师评价体系和评价机制进行改革创新,并结合教师的发展导向制定更加完善的改革方案,能够发挥出教师评价的重要作用,为我国教育改革的深入推进
黄河通信网有数字程控机80余台,有数十条数字微波干支线,连着大河上下百余个防汛指挥机关和千家万户;有15个450兆无线接入基台,600余个固定台连着县局以下的险工、水文(位)
天南星科(Araceae)魔芋属(Amorphophallus Blume)植物是多年生草本植物,主要分布在中南半岛、云南南部以及东南亚等地区。我国是魔芋的起源中心之一,经历长期的自然变异和栽