论文部分内容阅读
通过对冬季施工砼结构予养期的计算 ,并折算出其等效龄期通过试验确定予养是否安全 ,可以提前估计在予养期结束的强度。
Through the calculation of the construction period of the winter construction squatter and the calculation of the equivalent age of the cultivar through the test, it is possible to estimate the strength at the end of the gestation period in advance.